Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Perawatan & Perbaikan Gedung > 2023

Perancangan Pondasi Turbine Generator Engine di PLTMH

Foundation Design of Turbine Generator Engine in MHP

Skripsi, 011 / 2023 / TPPG
Undergraduate Theses from JBPTPPOLBAN / 2023-11-29 14:21:21
Oleh : 191144013 - Muhammad Fadhil Syah & 191144023 - Rifqy Fadhillah Pramudya (muhammad.fadhil.tppg19@polban.ac.id)
Dibuat : 2023-11-29, dengan 4 file

Keyword : Lumped Parameter Sytem, Pondasi Mesin, Daya Dukung Pondasi
Subjek : Lumped Parameter System, Machine Foundation, Bearing Capacity of Foundation

Turbin adalah mesin penggerak, dimana energi fluida kerja dipergunakan langsung untuk memutar sudu turbin (Munandar, 2004). Turbin dan generator memiliki berat sendiri dan juga memiliki getaran yang berpengaruh pada lingkungan sekitarnya. Oleh karena itu, diperlukan sebuah pondasi untuk menahan berat dan getaran dari turbin dan generator tersebut. Pondasi yang dapat menyalurkan beban dinamis dan beban statis ke tanah akibat mesin dikenal dengan pondasi mesin. Perencanaan pondasi mesin memperhitungkan 2 jenis beban yaitu beban statis akibat berat sendiri mesin dan pondasi serta beban dinamis akibat getaran mesin. Data tanah di dapatkan melalui pihak kedua yaitu panitia Civil National Expo 2023 Universitas Tarumanegara dan data mesin di dapatkan dari skripsi dengan judul “STUDI PERENCANAAN PONDASI DINAMIS MESIN GENERATOR TURBIN PADA PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (Studi Kasus : PLTMH Kec. Bungku Selatan Kab. Marowali Sulawesi Tengah)”. Preliminary design menjadi tahap awal dalam perencanaan ini, kemudian dilakukan analisis daya dukung pondasi akibat beban statis dan beban dinamis. Setelah didapatkan hasil analisis, dilakukan pengecekan terhadap persyaratan pondasi mesin. Dimensi pondasi yang memenuhi persyaratan pondasi mesin, kemudian dilakukan perhitungan penulangan pondasi. Setelah perhitungan tulangan dilakukan, kemudian dilakukan penggambaran secara detail menggunakan software AutoCad. Dari hasil perhitungan yang telah dilakukan, diketahui bahwa pondasi yang digunakan yaitu pondasi tiang pancang dengan dimensi 20 x 20 cm dengan tulangan utama yaitu 4D16 dan tulangan sengkang D10-200. Untuk pile cap yang digunakan yaitu ukuran 4,5 x 2,6 x 1 m dengan tulangan utama pada sumbu x dan y yaitu D22-200.

Deskripsi Alternatif :

Turbines are driving machines, where the energy of the working fluid is used directly to rotate the turbine blades (Munandar, 2004). Turbines and generators have their own weight and also have vibrations that affect the surrounding environment. Therefore, a foundation is needed to withstand the weight and vibration of the turbine and generator. Foundations that can transmit dynamic loads and static loads to the ground due to machinery are known as machine foundations. Machine foundation planning takes into account 2 types of loads, namely static loads due to the self-weight of the machine and foundation and dynamic loads due to machine vibrations. Soil data is obtained through the second party, namely the Civil National Expo 2023 committee of Tarumanegara University and machine data is obtained from a thesis with the title “STUDY OF DYNAMIC FOUNDATION PLANNING OF TURBINE GENERATOR MACHINES ON MICROHIDRO POWER PLANT (Case Study: MHP South Bungku Sub-District, Marowali District, Central Sulawesi)”. Preliminary design is the initial stage in this planning, then the bearing capacity of the foundation is analyzed due to static loads and dynamic loads. After obtaining the analysis results, a check is made on the requirements of the machine foundation. Foundation dimensions that meet the requirement of the machine foundation, then the calculation of foundation reinforcement is carried out. After the reinforcement calculation is done, a detailed drawing is done using AutoCad software. From the results of the calculations that haven been carried out, it is known that the foundation used is pile foundation with dimensions of 20 x 20 cm with the main reinforcement of 4D16 and D10-200 stirrup reinforcement. For the pile cap used, the size is 4,5 x 2,6 x 1 m with the main reinforcement in the x and y axes, namely D22-200.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Dr. Dewi Amalia, S.T., M.T.

    Pembimbing 2: Dr. Ir. Riawan Gunadi, M.T., Editor: Erlin Arvelina

Download...