Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Perawatan & Perbaikan Gedung > 2023
Perencanaan Penjadwalan Dan Biaya Dengan Penerapan Bim Pada Proyek Rumah Deret Tamansari Kota Bandung
Scheduling And Cost Planning With The Implementation Of Bim On The Apartment Tamansari Project Bandung City
Skripsi, 013 / 2023 / TPPGUndergraduate Theses from JBPTPPOLBAN / 2023-11-29 14:40:27
Oleh : 191144019 - Noval Alfarizy Anggoro Kasih & 191144021 - Nurazizah Puji Utami (noval.alfarizy.tppg19@polban.ac.id)
Dibuat : 2023-11-29, dengan 4 file
Keyword : Rumah susun, BIM, rencana anggaran biaya, penjadwalan
Subjek : Flats, BIM, budget plan, schedule
Salah satu proyek pembangunan rumah susun yang sedang dilaksanakan di Kota Bandung adalah Rumah Deret Tamansari. Gedung ini merupakan salah satu gedung pemerintah. Tujuan pembangunan rumah susun ini menurut Peraturan Wali Kota Bandung No. 665 Tahun 2017, yaitu dalam rangka penyelenggaraan penyediaan hunian untuk masyarakat berpenghasilan rendah sekaligus menata kawasan kumuh dan padat penduduk menjadi kawasan yang lebih berkualitas di Kelurahan Tamansari yang berwawasan lingkungan dengan konsep membangun tanpa menggusur. Berdasarkan Pasal 13 Permen PUPR No. 22 Tahun 2018, gedung tersebut termasuk pada kategori bangunan tidak sederhana. Maka dari itu, berdasarkan regulasi tersebut, penggunaan BIM diterapkan pada proyek Rumah Deret Tamansari. Metode pelaksanaan yang digunakan pada penyelesaian Tugas Akhir ini yaitu memodelkan pekerjaan struktur dalam bentuk 3D proyek Rumah Deret Tamansari dengan menggunakan software Tekla Structures sehingga dapat dihasilkan volume. Adapun volume untuk pekerjaan arsitektural dan MEP dilakukan secara manual. Setelah itu, dilakukan perhitungan RAB dengan menggunakan Microsoft Excel. Kemudian dilanjutkan dengan penyusunan penjadwalan proyek dengan menggunakan Microsoft Project. Berdasarkan hasil perhitungan, diperoleh total seluruh biaya untuk proyek pembangunan Rumah Deret Tamansari yaitu sebesar Rp73.502.975.158,15 dengan durasi pekerjaan proyek hingga selesai yaitu selama 491 hari kerja. Kata kunci: Rumah susun, BIM, rencana anggaran biaya, penjadwalan.
Deskripsi Alternatif :One of the apartment development projects currently being implemented in the city of Bandung is the Tamansari Row House. This building is a government building. According to Bandung Mayor Regulation No. 665 of 2017, namely in the context of organizing the provision of community housing for low-level repairs while at the same time managing slums and densely populated areas into higher quality areas in Tamansari Village which are environmentally sound with the concept of building without demolishing. Based on Article 13 of PUPR Regulation No. 22 of 2018, the building is included in the category of non-simple buildings. Therefore, based on these regulations, the use of BIM is applied to the Tamansari Row House project. The implementation method used in the completion of this Final Project is to model the structural work in the 3D of the Tamansari Row House project using Tekla Structures software so that volume can be generated. The volume calculation for architectural and MEP work is done manually. After that, the RAB calculation using Microsoft Excel. Then proceed with the preparation of project scheduling using Microsoft Project. Based on the calculation results, the total cost for the Tamansari Row House development project was obtained in the amount of Rp73.502.975.158,15 with the duration of the project work to completion around 491 working days. Keywords: Flats, BIM, budget plan, schedule.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ery Radya Juarti, S.T., M.T.
Pembimbing 2: Heri Kasyanto, S.T., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 191144019 & 191144021.pdf
(1561691 bytes)
File : BAB 1 - 191144019 & 191144021.pdf
(1759002 bytes)
File : BAB 2 - 191144019 & 191144021.pdf
(813207 bytes)
File : BAB 5 - 191144019 & 191144021.pdf
(480647 bytes)