Studi Maximum Power Point Tracking (MPPT) dengan metode Perturb and Observe (P&O) menggunakan Buck-Boost Converter di Pembangkit Listrik Tenaga Bayu (PLTB)
Maximum Power Point Tracking (MPPT) study using the Perturb and Observe (P&O) method using a Buck-Boost Converter in Wind Power Plants
Skripsi, 009 / 2023 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2024-03-20 10:59:44
Oleh : 191724005 - Dini Nurwahyuni (dininwahyuni@gmail.com)
Dibuat : 2024-03-20, dengan 4 file
Keyword : Turbin Angin, MPPT, Perturb & Observe, Buck-Boost Converter
Subjek : Wind Turbine, MPPT, Perturb & Observe, Buck-Boost Converter
Untuk memenuhi kebutuhan energi listrik dibutuhkan suatu alternatif agar beban listrik dapat terpenuh. Salah satu alternatif yang dapat digunakan dengan menggunakan sumber energi terbarukan. Pembangkit tersebut dapat berupa Pembangkit Listrik Tenaga Bayu (PLTB). PLTB dapat menghasilkan daya yang berubah-ubah tergantung dengan kualitas angin. Dengan adanya daya hasil yang dapat berubah-ubah diperlukan suatu metode agar daya keluaran tersebut dapat berada didaya maksimum secara konsisten pada kecepatan tertentu. Salah satu metode yang dapat diimplementasikan yaitu menggunakan MPPT (Maximum Power Point Tracking). Dengan menggunakan MPPT ini maka daya yang diharapkan akan secara konsisten didaya maksimum pada kecepatan angin tertentu. Tugas Akhir ini membahas mengenai studi Maximum Power Point Tracking (MPPT) dengan metode Perturb and Observe (P&O) menggunakan Buck-Boost Converter di Pembangkit Listrik Tenaga Bayu (PLTB). Diharapkan penggunaan sistem kontrol MPPT dengan menggunakan metode P&O pada turbin angin dapat membuat daya keluaran turbin angin lebih besar dibandingkan dengan turbin angin yang tidak menggunakan sistem kontrol MPPT. Dengan kenaikan kecepatan angin, semakin besar presentase rata-rata kenaikan daya output dari turbin angin dengan MPPT terhadap turbin angin tanpa MPPT. Pada kecepatan 5 m/s kenaikan presentase turbin angin pada turbin angin sebesar 92,43%.
Deskripsi Alternatif :To meet the needs of electrical energy, an alternative is needed so that the electrical load can be fulfilled. One alternative that can be used is to use renewable energy sources. The power plant can be a wind power plant (PLTB). PLTB can produce power that varies depending on the quality of the wind. With the output power that can vary, a method is needed so that the output power can be consistently at maximum power at a certain speed. One method that can be implemented is using MPPT (Maximum Power Point Tracking). By using this MPPT, the expected power will consistently be maximum at a certain wind speed. This final project discusses the Maximum Power Point Tracking (MPPT) study using the Perturb and Observe (P&O) method using a Buck-Boost Converter in Wind Power Plants (PLTB). It is expected that the use of the MPPT control system using the P&O method on wind turbines can make the output power of wind turbines greater than that of wind turbines that do not use the MPPT control system. With the increase in wind speed, the greater the average percentage increase in output power from wind turbines with MPPT to wind turbines without MPPT. At a speed of 5 m/s, the increase in the percentage of wind turbines in wind turbines is 92.43%.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Aceng Daud, S.T., M.Eng.
Pembimbing 2: Ir. Sri Paryanto Mursid, M.Sc., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 191724005.pdf
(961582 bytes)
File : BAB 1 - 191724005.pdf
(217356 bytes)
File : BAB 2 - 191724005.pdf
(641275 bytes)
File : BAB 5 - 191724005.pdf
(207835 bytes)