Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2023

Rancangan Sistem Pemipaan Air Blowdown Untuk Service Water Di PLTGU Priok POMU

Design Of A Blowdown Water Utilization System For Service Water At PLTGU Priok POMU

Skripsi, 014 / 2023 / TPTL
Undergraduate Theses from JBPTPPOLBAN / 2024-03-20 11:17:42
Oleh : 191724012 - Hima Nur Triana (trianahima@gmail.com)
Dibuat : 2024-03-20, dengan 4 file

Keyword : Heat Recovery Steam Generator, Air Blowdown, Konduktivitas
Subjek : Heat Recovery Steam Generator, Blowdown Water, Conductivity

Pada sistem PLTGU, HRSG (Heat Recovery Steam Generator) merupakan komponen utama yang digunakan untuk menghasilkan fluida kerja bagi turbin uap. Dalam proses yang terjadi pada HRSG, kualitas air umpan dijaga melalui sistem blowdown. Sistem blowdown terdiri dari blowdown tank yang berfungsi menampung air blowdown dari semua jalur drain pada HRSG yang kemudian dialirkan melalui blowdown pump menuju blowdown heat exchanger untuk diturunkan temperaturnya. Air blowdown yang ternyata memiliki nilai konduktivitas <60 μS/cm masih dapat dimanfaatkan kembali apabila digunakan untuk kebutuhan service water blok 1-2 yang memiliki batas konduktivitas sebesar 80 μS/cm. Untuk dapat memanfaatkan air blowdown tersebut, maka dilakukan perancangan sistem pemipaan untuk mengalirkan air blowdown menuju jalur pipa interkoneksi menuju service water tank blok 1-2. Hasil rancangan yang diperoleh adalah sistem pemipaan memerlukan pipa sepanjang 49.28 m, 6 buah elbow 90ᵒ long radius, satu buah ball valve, check valve, dan gate valve dengan daya pompa untuk dapat mengalirkan air blowdown sebesar 0.4 kW. Kata Kunci: Heat Recovery Steam Generator, Air Blowdown, Konduktivitas.

Deskripsi Alternatif :

In the PLTGU system, HRSG (Heat Recovery Steam Generator) is the main component used to produce working fluid for the steam turbine In the process that occurs at HRSG, feed water quality is maintained through a blowdown system. The blowdown system consists of a blowdown tank that functions to accommodate blowdown water from all drain lines on the HRSG which is then channeled through a blowdown pump to the blowdown heat exchanger to lower its temperature. Blowdown water which has a conductivity value of <60 μS/cm can still be reused if it is used for service water block 1-2 which has a conductivity limit of 80 μS/cm. To be able to take advantage of the blowdown water, a piping system is designed to drain the blowdown water to the interconnection pipelines to the service water tank blocks 1-2. The design results obtained are that the piping system requires a 49.28 m long pipe, 6 elbows of 90ᵒ long radius, one ball valve, check valve, and gate valve with pump power to be able to drain blowdown water of 0.4 kW. Keywords: Heat Recovery Steam Generator, Blowdown Water, Conductivity.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ratu Fenny Muldiyani, S.Si., M.Si.

    Pembimbing 2: Ika Yuliyani, S.T., M.T., Editor: Erlin Arvelina

Download...