Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2023
Rancangan Fin-Tube Surface Cleaning System untuk Pembersihan Air Cooled Heat Exchanger di Priok Pomu Blok 4
Fin-Tube Surface Cleaning System Design for Cleaning Air Cooled Heat Exchanger at Block 4 Priok Pomu
Skripsi, 015 / 2023 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2024-03-20 11:20:42
Oleh : 191724013 - Ijlal Syaifullah (ijlal.syaifullah.tptl19@polban.ac.id)
Dibuat : 2024-03-20, dengan 4 file
Keyword : sistem perpipaan, zat pengotor, pemeliharaan preventif, nozel
Subjek : piping system, impurities, preventive maintenance, nozzles
Pemeliharaan pembersihan permukaan luar fin-tube pada air cooled heat exchanger perlu dilakukan untuk menjaga performa agar proses perpindahan panas tidak terganggu. Penurunan performa dapat terjadi ketika terdapat pengendapan zat pengotor berupa debu di permukaan luar fin-tube. Debu terakumulasi di atas sirip dan di antara sirip, terkadang debu terkumpul sebagai bubuk halus dan ketika terkena air akan membentuk endapan berkerak. Di Priok POMU masih dilakukan secara manual sehingga membutuhkan usaha dan man power yang cukup banyak, sehingga memerlukan inovasi terkait pemeliharaan pembersihan yaitu menggunakan sistem pembersihan untuk mengurangi usaha yang biasa dilakukan. Rancangan dilakukan secara manual menggunakan perhitungan berprinsip dasar hukum Bernoulli serta dilakukan simulasi menggunakan Ansys Fluent. Rancangan menghasilkan tekanan kerja yang cukup untuk menyuplai air dan kecepatan inlet nozel 0,3655 m/s pada masing â masing nozel berjumlah 36 buah setiap fan atau 648 buah untuk mencakup 18 fan. Pembersihan dapat dilakukan dengan baik ketika kecepatan masuk nozel sebesar 0,3655 m/s yang membutuhkan waktu pembersihan 59,01 menit dan mampu membersihkan debu sebanyak 2,3957Ã10^(-8) kg. Pembersihan dilakukan secara manual dengan bertahap setiap bulan, proses pembersihan hanya dapat berlangsung ketika fan tidak beroperasi untuk mendapatkan hasil yang baik. Kata kunci: sistem perpipaan, zat pengotor, pemeliharaan preventif, nozel.
Deskripsi Alternatif :Maintenance of cleaning the outer surface of the fin-tube on the air cooled heat exchanger needs to be done to maintain performance so that the heat transfer process is not disturbed. A reduction in performance can occur when there is a deposition of impurities in the form of dust on the outer surface of the fin-tube. Dust accumulates on top of the fins and between the fins, sometimes dust collects as a fine powder and when exposed to water will form a crusty deposit. In Priok POMU, it is still done manually so it requires a lot of effort and man power, so it requires innovation related to cleaning maintenance, namely using a cleaning system to reduce the usual effort. The design is done manually using the calculation based on Bernoulli's law and simulation using Ansys Fluent. The design resulted in a working pressure sufficient to supply water and a nozzle inlet velocity of 0,3655 m/s at each nozzle totaling 36 pieces per fan or 648 pieces to cover 18 fans. Cleaning can be done well when the inlet speed of the nozzles is 0,3655 m/s which requires a cleaning time of 59,01 minutes and is able to clean 2.3957Ã10^(-8) kg of dust. Cleaning is done manually in stages every month, the cleaning process can only take place when the fan is not operating to get good results. Keywords: piping system, impurities, preventive maintenance, nozzles.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ratu Fenny Muldiyani, S.Si., M.Si.
Pembimbing 2: Ir. Teguh Sasono, M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 191724013.pdf
(998043 bytes)
File : BAB 1 - 191724013.pdf
(1013894 bytes)
File : BAB 2 - 191724013.pdf
(1394969 bytes)
File : BAB 5 - 191724013.pdf
(409402 bytes)