Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2023

Studi Proteksi Arus Lebih Fasa Dan Netral Pada Transformator 20 kV Di Plts 1 MW Cirata

Phase And Neutral Overcurrent Protection Study On 20 kV Transformer at PLTS 1 MW Cirata

Skripsi, 019 / 2023 / TPTL
Undergraduate Theses from JBPTPPOLBAN / 2024-03-20 11:46:20
Oleh : 191724018 - Michael (parulian424@gmail.com)
Dibuat : 2024-03-20, dengan 4 file

Keyword : Relay, OCR, PLTS, Proteksi Arus Lebih
Subjek : Relay, OCR, PLTS, Overcurrent Protection

Sistem proteksi pada transformator distribusi berperan penting dalam menjaga stabilitas dan kontinuitas memasok energi listrik dari PLTS 1 MW Cirata ke PLTA Cirata. Interkoneksi pada PLTS 1 MW Cirata dengan PLTA Cirata milik PT. PLN Nusantara Power bertujuan untuk mengurangi pemakaian sendiri pada operasi PLTA. Setelah PLTS beroperasi dari tahun 2015 belum terdapat studi kembali mengenai keandalan setting proteksi arus lebih pada transformator distribusi PLTS. Maka tugas akhir ini membahas mengenai evaluasi proteksi arus lebih terhadap transformator distribusi PLTS dengan mengacu pada standar BS 142, IEC 60255, dan IEEE C-37112. Terdapat tahapan-tahapan yang dilakukan pada penelitian ini diantaranya: pengumpulan data eksisting, pemodelan sistem pengaman transformator, simulasi hubung singkat, dan analisis hasil evaluasi .Berdasarkan studi yang dilakukan terdapat pengturan arus pickup yang tidak sesuai dengan standar, yang dapat mengakibatkan false trip. Kemudian relay yang digunakan belum terdapat setting arus lebih waktu instan yang dapat mengakibatkan pemutusan yang telalu cepat pada saat terjadi gangguan arus lebih. Rekomendasi yang diberikan ialah resetting relay pada karakteristik waktu invers dan instan sesuai dengan standar yang ada. Serta merekomendasikan penambahan relay diferensial untuk meningkatkan keandalan pengaman pada transformator. Kata Kunci: Relay, OCR, PLTS, Proteksi Arus Lebih.

Deskripsi Alternatif :

The protection system on the distribution transformer plays an important role in maintaining the stability and continuity of supplying electrical energy from PLTS 1 MW Cirata to PLTA Cirata. The interconnection of the 1 MW Cirata solar power plant with the Cirata hydropower plant owned by PT PLN Nusantara Power aims to reduce self-use in hydropower operations. After PLTS has been operating from 2015, there has been no re-study of the reliability of the overcurrent protection settings on the PLTS distribution transformer. So this final project discusses the evaluation of overcurrent protection for PLTS distribution transformers with reference to BS 142, IEC 60255, and IEEE C-37112 standards. There are stages carried out in this study including: collection of existing data, modeling of transformer safety systems, short circuit simulation, and analysis of evaluation results. Based on the studies conducted, there are pickup current settings that are not in accordance with the standard, which can result in false trips. Then the relay used does not have an instant time overcurrent setting which can result in a disconnection that is too fast when an overcurrent disturbance occurs. The recommendation given is resetting relays on inverse and instant time characteristics in accordance with existing standards. As well as recommending the addition of differential relays to increase the reliability of the safety on the transformer. Keywords: Relay, OCR, PLTS, Overcurrent Protection.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Prof. Dr. Ir. Hermagasantos Zein, M.Sc.

    Pembimbing 2: Siti Saodah, S.T., M.T., Editor: Erlin Arvelina