Perancangan Condensing Turbine Jenis Impuls Pembangkit Listrik Tenaga Panas Bumi 55 MW

Design Of Impulse Type Condensing Turbine In 55 MW Geothermal Power Plant

Skripsi, 013 / 2023 / TKE
Undergraduate Theses from JBPTPPOLBAN / 2024-01-09 11:22:07
Oleh : 191734014 - Gabriella Ivonne Anggadewi (gabriella.ivonne.tken419@polban.ac.id)
Dibuat : 2024-01-09, dengan 4 file

Keyword : PLTP, turbin kondensasi, perancangan turbin impuls
Subjek : geothermal power plant, condensing turbine, impulse turbine design

embangkit Listrik Tenaga Panas Bumi (PLTP) 55 MW telah beroperasi selama 35 tahun. Pembangkit ini mengalami penurunan efisiensi turbin dari 0,88 menjadi 0,56. Penurunan efisiensi turbin berdampak pada peningkatan jumlah volume uap, penurunan daya yang dihasilkan turbin, dan ketidakstabilan daya output pembangkit. Penelitian ini bertujuan untuk merancang turbin uap PLTP 55 MW yang berjenis condensing turbine dengan prinsip pengubahan impuls pada kondisi tekanan uap 6,50 bar. Hasil perancangan akan dianalisis kelayakan ekonomi berdasarkan metode Net Present Value, Payback Period, dan Internal Rate of Return untuk memastikan kelayakannya sebelum diproduksi dan dioperasikan. Turbin uap yang dirancang terdiri dari enam tingkatan, jenis arah aliran uap aksial, tipe aliran tunggal, kecepatan putar 3000 rpm, tekanan uap masuk 6,50 bar, tekanan uap keluar 0,15 bar. Hasil perancangan menunjukkan peningkatan kinerja dengan menghasilkan efisiensi internal 0,66 dan efisiensi relatif 0,73 saat turbin beroperasi dengan jumlah uap sebesar 144,46 kg/s. Turbin ini layak diproduksi dan dioperasikan karena telah memenuhi persyaratan kelayakan ekonomi dengan nilai Net Present Value sebesar Rp 243.816.146.409.928,00 dan Internal Rate of Return sebesar 58%. Payback Period atau modal investasi akan kembali setelah 1,72 tahun. Kata Kunci: PLTP, turbin kondensasi, perancangan turbin impuls.

Deskripsi Alternatif :

The 55 MW Geothermal Power Plant (PLTP) has been operating for 35 years. This plant experienced a decrease in turbine efficiency from 0.88 to 0.56. The decrease in turbine efficiency has an impact on an increase in the amount of steam volume, a decrease in the power produced by the turbine, and the instability of the power output of the plant. This study aims to design a 55 MW PLTP steam turbine with the principle of converting impulses at steam pressure conditions of 6.50 bar. The design results will be analyzed for economic feasibility based on the Net Present Value, Payback Period, and Internal Rate of Return methods to ensure feasibility before being produced and operated. The designed steam turbine consists of six levels, axial steam flow direction type, single flow type, rotating speed 3000 rpm, inlet steam pressure 6.50 bar, and outgoing steam pressure 0.15 bar. The design results showed improved performance by resulting in an internal efficiency of 0.66 and a relative efficiency of 0.73 when the turbine operated with a total steam of 144.46 kg/s. This turbine is suitable to be produced and operated because it has met the economic feasibility requirements with a Net Present Value of Rp 243,816,146,409,928.00 and an Internal Rate of Return of 5.8%. The payback period or investment will return after 1.72 years. Keywords: geothermal power plant, condensing turbine, impulse turbine design.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Prof. Dr. Ir. Sri Wuryanti, M.Si.

    Pembimbing 2: Alvera Apridalianti M., S.T., M.T., Editor: Erlin Arvelina

Download...