Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2013 > REGULER
PERANCANGAN SISTEM DRAINASE BERWAWASAN LINGKUNGAN PADA JALAN DR. SETIABUDHI SEPANJANG 2,9 KM DI KOTA BANDUNG
DESIGN OF ECO DRAINAGE SYSTEM AT DR. SETIABUDHI'S ROAD ALONG 2,9 KM IN BANDUNG
Tugas Akhir, 007 /2013 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:55
Oleh : Achmad Firdaus - 091134001 (uz.sync@yahoo.com)
Dibuat : 2015-06-30, dengan 4 file
Keyword : Drainase, Sumur Resapan, Metode Sunjoto, Berwawasan Lingkungan
Subjek : Drainage, Infiltration wells, Sunjoto Method, Environmental
Peningkatan populasi penduduk di Kecamatan Sukasari dengan rata-rata peningkatan sebesar 1,6752% menyebabkan meningkatnya produksi air limbah pada daerah tersebut, disamping bencana banjir yang sering terjadi pada daerah tersebut. Hal tersebut menyebabkan terganggunya struktur jalan yang seharusnya dapat mengair ke saluran drainase dengan baik, yang terjadi adalah menggenang dan mengalir di badan jalan. Metode yang digunakan dalam perencanaan sistem drainase berwawasan lingkungan ini adalah metode Rasional untuk perhitungan dimensi dan kemiringan saluran drainase. Sedangkan untuk perhitungan kebutuhan sumur resapan memakai metode Sunjoto. Dari hasil perhitungan tugas akhir, didapatkan dimensi yang ideal untuk meampung seluruh debit air, baik air hujan dan air limbah, dapat dicontohkan untuk dimensi pada daerah tangkapan nomor 4, dimensi yang ideal untuk menampung debit aliran adalah memiliki tinggi 2,3 meter dan lebar 0,6 meter. Kebutuhan untuk sumur resapan pada perencanaan drainase ini adalah 441 buah sumur resapan, 267 buah untuk sisi kiri (arah Lembang) dan 174 buah untuk sisi kanan (arah Bandung). Perhitungan rancangan anggaran biaya pada perencanaan drainase berwawasan lingkungan ini adalah Rp. 4,376,627,000.00. Biaya tersebut meliputi keseluruhan biaya pekerjaan saluran drainase dan pekerjaan sumur resapan. Sedangkan untuk pekerjaan drainase per meternya menelan biaya sebesar Rp. 720,443.45. Kata Kunci : Drainase, Sumur Resapan, Metode Sunjoto, Berwawasan Lingkungan
Deskripsi Alternatif :Increase of population in the District of Sukasari with an average of 1.6752% led to increased production of sewage in the area, as well as the floods that frequently happened to the area. It caused disruption of the structure which should be able to flow into the drainage channel, which was pooled and flowing on the road. Method of calculation of design drainage environmental concept was a Rational Method to calculate about the dimension and elevation of drainage. Meanwhile, for calculate of necessary about infiltration wells that involved the use of Sunjoto Method. Result of calculation found the ideal dimensions to accommodate the entire flow of water, either rain water and sewage, can be exemplified for dimensions on catchment area number 4, the dimension which ideal for accommodate debit of the flow is has a height 2.3 meters and width 0. 6 meters. The need for infiltration wells on the planning of the drainage this is the 441 infiltration wells, 267 for the left side (the way to Lembang) and 174 for the right side (the way to Bandung). Calculation of the project cost of Eco-Drainage is Rp. 4,376,627,000.00. Cost includes the total cost of the work of drainage and work of infiltration wells. Where as job of drainage for every meter needed cost to Rp. 720,443.45. Keywords: Drainage, Infiltration wells, Sunjoto Method, Environmental
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Dra. Ruth Ester Ambat, MT.
Pembimbing 2: Angga Marditama Sultan Sufanir, ST., MT., Editor: Erlin Arvelina
Download...
File : DAFTAR - 091134001.pdf
(950378 bytes)
File : BAB 1 - 091134001.pdf
(522906 bytes)
File : BAB 2 - 091134001.pdf
(1054278 bytes)
File : BAB 5 - 091134001.pdf
(416324 bytes)