Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2017
Rancangan Sistem Pendingin Udara Masuk Pada Pltg Menggunkana Absorption Chiller
Design Of Air Inlet Cooling System At Gas Turbine Power Plant Using Absorption Chiller
Tugas Akhir, 002 / 2017 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:18
Oleh : Adinda Ayu Lestari - 131724002 (adindayu16@gmail.com)
Dibuat : 2017-10-27, dengan 4 file
Keyword : absorption chiller, cooling coil, pendinginan, udara
Subjek : gas turbine, absorption chiller, cooling coil, air cooling
Udara merupakan salah satu hal yang penting dalam proses pembakaran. Temperatur udara masuk pada PLTG dapat berpengaruh terhadap kinerja turbin gas. Seiring meningkatnya temperatur udara, maka daya yang dihasilkan turbin gas semakin turun. Untuk itu diperlukan sistem pendingin untuk mendinginkan udara masuk turbin gas agar sesuai dengan standar operasinya yaitu pada temperatur 15 oC. Sistem pendingin yang dapat digunakan adalah absorption chiller yang bekerja menggunakan panas dari gas buang turbin gas sehingga menghasilkan chilled water yang kemudian mengalir dalam cooling coil untuk mendinginkan udara. Perancangan sistem pendingin dimulai dengan menentukan parameter awal rancangan yaitu massa udara, massa keluaran gas buang dan temperatur gas buang. Kemudian menghitung beban pendinginan untuk menentukan kapasitas absorption chiller yang dibutuhkan. Sedangkan detail rancangan dilakukan pada bagian cooling coil. Cooling coil dirancang berdasarkan rancangan heat exchanger pada umumnnya dengan menggunakan metode Kern. Dari rancangan didapatkan hasil bahwa kapasitas absorption chiller yang dibutuhkan sebesar 1.336,2 kW. Dalam proses pendinginannya, absorption chilller tersebut menyerap panas dari gas buang sebesar 1.463,9 kW. Dimensi pipa cooling coil yang ditentukan yaitu bahan pipa: tembaga, diameter luar: 5/8 inch, ketebalan: 0,035 inch, panjang pipa: 3m. cooling coil bersfungsi sebagai penukar panas antara udara masuk dengan chilled water yang dihasilkan absorption chiller. Temperatur udara didinginkan hingga 15 oC dan daya yang dihasilkan setelah adanya penerapan sistem pendingin udara meningkat sebesar 2,2 MW. Kata kunci: absorption chiller, cooling coil, pendinginan, udara.
Deskripsi Alternatif :Air is one of the key elements in a combustion process. The inlet air temperature of gas fired power plant system affects the performance of the gas turbine. As the air temperature increase, the output power of the turbine will be reduced. Therefore, a cooling system is needed to lower the temperature of the inlet air to match the standard operating temperature of 15 oC. The type of cooling system that can be used is Absorption Chiller which uses heat from the flue gas of the gas turbine to produce chilled water which then will be channelled to cooling coil to cool the inlet air. The design of the cooling system was initialized by determining design parameters including air mass flow rate, flue gas flow rate, and flue gas temperature. After that, cooling load was calculated to determine the required capacity of the absorption chiller. The cooling coil was design in more detail. The cooling coil was designed based on general heat exchanger design method of Kern. The designed absorption chiller requires a capacity of 1,336.2 kW. In the cooling process, the absorption chiller absorbs the heat from the flue gas as much as 1,463.9 kW. The material that is used for the cooling pipe is copper, the outside diameter, thickness and length of the pipe are 5/8 inch, 0.035 inch and 3 meter respectively. The main function of the cooling coil is to exchange the heat between inlet air and the chilled water that produced by absorption chiller. The inlet air is cooled until the temperature reaches 15 oC and the output power increase as much as 2.2 MW due to the cooling system. Keywords: gas turbine, absorption chiller, cooling coil, air cooling.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Bambang Puguh Manunggal, S.T., M.Eng.
Pembimbing 2: Ika Yuliyani, S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 131724002.pdf
(1109020 bytes)
File : BAB 1 - 131724002.pdf
(170973 bytes)
File : BAB 2 - 131724002.pdf
(676635 bytes)
File : BAB 5 - 131724002.pdf
(207680 bytes)