Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2018

Perencanaan Pondasi Pada Gedung Kantor Di Perumahan Cibaduyut Indah

Foundation Planning On The Development Of Offices In Cibaduyut Indah Housing

Tugas Akhir, 001 / 2018 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2018-10-12 08:30:08
Oleh : Anggi Khaerani Fatonah - 141111003 (anggi.khaeranif@gmail.com)
Dibuat : 2018-10-12, dengan 4 file

Keyword : Tanah, Pondasi, Daya Dukung Pondasi
Subjek : Soil, Foundation, Foundation Supporting Capacity

Proyek "Perencanaan Pondasi pada Pembangunan Kantor di Perumahan Cibaduyut Indah" ini dilakukan untuk merencanakan pondasi bagaimana yang cocok dalam lingkungan daerah tersebut.kama diperlukan nya suatu perencanaan dalam memperhitungan jenis dan jumlah pondasi apa yang cocok agar dalam pembangunan gedung tersebut tidak mengalami keruntukan dalam pembebanan gedung tersebut. Pengujian yang dilakukan dalam perencanaan proyek ini adalah berupa pengujian sifat-sifat fisik tanah, pemadatan dan pengujian CBR. Dari hasil pengujian ini dapat dihitung mengenai bagaimana jumlah podasi dan daya dukung tanah yang nantinya akan dipakai didaerah proyek. Dalam pemilihan jenis tiang bor untuk pondasi dapat ditinjau dari beberapa aspek mulai dari jenis tanah, lingkungan yang akan dijadikan lahan proyek serta pembiayaan dalam proyek tersebut. Dalam perencanaan pondasi tersebut menggunakan aplikasi SAP2000 untuk mendapatkan gaya yang dihasilkan dari gedung tersebut. Dan untuk menghitung daya dukung tanah berdsarkan nilai Nspt dan data Sondir. Perhitungan pilecap dan tulangan pondasi menggunakan SNI 1726-2012. Dan berdasarkan perhitungan tersebut dapat digunakan tiang bor dengan diameter 80 cm. Perencanaan pondasi dengan menggunakan tulangan utama 12D22 dengan tulangan geser D12-300. Kata kunci: Tanah, Pondasi, Daya Dukung Pondasi.

Deskripsi Alternatif :

The project "Foundation Planning on the Development of Offices in Cibaduyut Indah Housing" is done to plan the foundation of how appropriate in the environment of the area. When it is necessary to plan in calculating the type and amount of the foundation of what is suitable so that in the construction of the building does not have a rundown in the loading of the building the. The tests undertaken in the planning of this project are in the form of examination of soil physical properties, compaction and CBR testing. From the results of this test can be calculated on how the number of foundation and soil bearing capacity that will be used in the project area. In the selection of the type of drill pit for the foundation can be viewed from several aspects ranging from the type of soil, the environment to be used as project land and financing in the project. In planning the foundation uses SAP2000 application to get the style generated from the building. And to calculate the carrying capacity of the soil based on the Nspt value and the Sondir data. Calculation of pilecap and foundation reinforcement using SNI 1726-2012. And based on the calculation can be used drill pole with a diameter of 80 cm. Planning the foundation using the 12D22 main reinforcement with shear reinforcement D12- 300. Keywords: Soil, Foundation, Foundation Supporting Capacity.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Ir. Geni Firuliadhim, M.T., Editor: Erlin Arvelina

Download...