Path: Top > Tugas Akhir - D3 > Jurusan Teknik Konversi Energi > Program Studi Teknik Konversi Energi > 2014
Audit Energi Sistem HVAC Gedung Kantor Pusat PT Industri Telekomunikasi Indonesia
Energy Audit Of HVAC System At Central Office Building PT Industri Telekomunikasi Indonesia
Tugas Akhir, 043 / 2014 / TENUndergraduate Theses from JBPTPPOLBAN / 2018-04-20 11:48:25
Oleh : Anggita Lieska Rianti - 111711003 (anggita.lieska@gmail.com)
Dibuat : 2018-04-20, dengan 4 file
Keyword : Audit, Chiller, COP, Konservasi Energi
Subjek : Audit, Chiller, COP, Energy Conversation
Sistem HVAC pada GKP PT.INTI merupakan sistem sentral dengan memanfaatkan mesin chiller sebagai mesin pendingin. Dengan mengkonsumsi sebesar 65% dari konsumsi energi listrik keseluruhan, sistem HVAC menjadi pengonsumsi energi tertinggi pada gedung. Identifikasi peluang penghematan energi dan pengoptimalan performa dilakukan dengam amalisa COP dari chiller. Audit yang dilakukan pada chiller menunjukkan bahwa terjadi penurunan performa chiller sebesar 12,5% untuk chiller 1 dan 10,08% untuk chiller 3 dari saat commissioning. Konservasi energi dilakukan untuk meningkatkan kembali performa dan menghemat energi serta biaya operasi. Pengurangan jam kerja menghemat 4,8% , kontrol termostat menghemat 8,6 %, dan penggantian R-22 ke MC-22 menghemat 9,6% dari biaya konsumsi energi listrik keseluruhan. Performa mesin chiler pun meningkat sebesar 27,4% untuk chiller 1 dan 28,9% untuk chiller 3 setelah dilakukan kontrol termostat. Penggantian R-22 ke MC-22 meningkatkan performansi chiller sebesar 32,2% untuk chiller 1 dan 30%. Untuk chiller 3. Kata Kunci: Audit, Chiller, COP, Konservasi Energi.
Deskripsi Alternatif :HVAC system at GKP PT.INTI is a central system by utilizing chiller as the cooler engine. The system are consuming 65% energy of total energy at GKP PT. INTI, this makes HVAC system as the most consumptive system at the building. Alternative identification for reducing energy cost as well as increasing chiller performance is done by analyzing the COP. The initial audit showed that the chiller performance decreased by 10,08% for chiller 1 and by 12,5% for chiller 3 of the time of commissioning. Energy conservation is done to improve performance and saving energy as well as operating costs. Reduction of working hours can save 4,8%, thermostat control saving 8,6% , and replacement of R-22 to MC-22 saves 9,6% of the total electrical energy consumption. The chiller performance was increased by 27,4% for chiller 1 and 28,9% for chiller 3 after the thermostat control. Replacement of R-22 to MC-22 improves chiller performance by 32,3% for chiller 1 and 30% .for chiller 3. Keywords: Audit, Chiller, COP, Energy Conversation.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Drs. Ali Mashar, M.Eng.Sc., Editor: Erlin Arvelina
Download...
File : DAFTAR - 111711003.pdf
(1812988 bytes)
File : BAB 1 - 111711003.pdf
(363694 bytes)
File : BAB 2 - 111711003.pdf
(558345 bytes)
File : BAB 5 - 111711003.pdf
(160899 bytes)