Perancangan Perkuatan Longsoran Badan Jalan Pada Ruas Jalan Sumedang-Cijelag KM 61+430 Menggunakan Tiang Bor
Design Of The Retaining Landslide At Sumedang-Cijelag KM 61+430 With Bored Pile
Tugas Akhir, 018 / 2012 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:48
Oleh : Anna Apriliana - 091135017
Dibuat : 2013-01-08, dengan 4 file
Keyword : Pondasi
Subjek : Foundation
Pondasi merupakan struktur bawah yang berfungsi meneruskan beban kepada tanah baik beban vertikal maupun beban horisontal. Perencanaan pondasi pada suatu bangunan sangat diperlukan mengingat berat bangunan dan unsur-unsur lain didalamnya yang diterima pondasi tidak boleh melebihi daya dukung tanahnya untuk menjamin keamanan bangunan. Dalam perencanaan pondasi hal yang perlu diperhatikan adalah karakteristik tanah di lapangan dan beban struktur atas bangunan. Berdasarkan hitungan dimensi pondasi tiang bor diameter 1 m dengan kedalaman 15 m. Pondasi tersebut menggunakan tulangan utama D22 dengan jumlah tulangan sebanyak 22 batang. Tebal penutup kepala tiang atau pile cap yang digunakan berukuran 600 mm serta menggunakan tulangan dengan diameter 20 mm sampai 22 mm. Jarak antar tiang yang digunakan sebesar 1.5D atau sama dengan 1.5 m. Jumlah tiang yang digunakan dalam penanganan longsoran pada Ruas Jalan Sumedang-Cijelag Km 61+430 sebanyak 5 tiang. Dengan harga untuk tiap tiangnya sebesar Rp. 371.532.470,00
Deskripsi Alternatif :The foundation is the structure that serves to continue the load to ground load both vertical and horizontal loads. Planning the foundation of a building is necessary given the weight of the building and other elements therein received the foundation may not exceed the carrying capacity of the land to ensure the safety of the building. In planning the foundation of things to note are the characteristics of the soil in the field and the load on the building structure.
Based on the calculations, the dimensions of the foundation pile diameter 1 m with a depth of 15 m. The foundation is using the D22 with the number of primary reinforcement reinforcement by 22 rods. Thick cover mast head or pile cap used measuring 600 mm and using reinforcement with a diameter of 20 mm to 22 mm.
The distance between the poles that are used for 1.5D or equal to 1.5 m. The number of poles that are used in the treatment of avalanches on the road segment Sumedang-Cijelag Km 61 +430 by 5 poles. With prices for each of the poles of Rp. 371,532,470.00
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing POLBAN: Mulyadi Y., Drs., Dipl.Ing.HTL., MT.
Pembimbing Dept. PU: Slamet Prabudi Setianto, ST., MT. , Editor: Erlin Arvelina
Download...
File : DAFTAR - 091135017.pdf
(406622 bytes)
File : BAB 1 - 091135017.pdf
(597667 bytes)
File : BAB 2 - 091135017.pdf
(1316248 bytes)
File : BAB 5 - 091135017.pdf
(361503 bytes)