Path: Top > Skripsi - D4 > 2017 > Jurusan Administrasi Niaga > Program Studi Manajemen Aset > KERMA > 2017
Perancangan Kebutuhan Aset Gudang Transit Untuk Penghapusan Barang Milik Negara Di Politeknik Negeri Bandung
Asset Need Design of Transit Warehouse for Public Asset Disposal in State Polytechnic of Bandung
Tugas Akhir, 031 / 2017 / MAS-KERMA PUUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:27
Oleh : Arief Permadi Putra - 135245010 (ariefpermadip@gmail.com)
Dibuat : 2018-02-27, dengan 4 file
Keyword : perancangan kebutuhan, gudang transit
Subjek : need design, transit warehouse
Di Politeknik Negeri Bandung, gudang untuk barang milik negara yang akan dihapuskan tidak ada. Padahal, barang milik negara harus diamankan secara fisik sebelum dihapuskan. Dengan demikian, Politeknik Negeri Bandung membutuhkan gudang transit untuk barang milik negara yang akan dihapuskan. Proyek ini bertujuan untuk membuat rancangan gudang transit yang mencakup overall structure, sizing and dimensioning, dan operation strategy. Overall structure meliputi analisis kebutuhan aset gudang transit berdasarkan data wawancara dan observasi. Sizing and dimensioning merupakan tahapan untuk merancang luas dan tata letak penyimpanan gudang. Operation strategy mencakup operasi gudang beserta sketsa alurnya. Metode proyek yang digunakan dalam tugas akhir ini adalah metode deskriptif. Sedangkan, teknik pengumpulan data yang dilakukan adalah dengan observasi, wawancara, dan studi dokumentasi dan literatur. Observasi dilakukan secara langsung terhadap kondisi penyimpanan barang milik negara yang akan dihapuskan. Wawancara dilakukan kepada pengelola gudang setiap jurusan. Studi dokumentasi dan literatur berdasarkan arsip pengelola dan studi literatur. Dari hasil proyek menunjukan bahwa Polban membutuhkan gudang transit untuk penghapusan BMN. Dalam sizing and dimensioning menghasilkan luas gudang 572 meter persegi dan volume gudang 2.288 meter kubik dengan tinggi gudang 4 meter, lebar aisle 3 meter dan tata letak penyimpanannya menggunakan 125 buah pallet. Untuk operation strategy, operasi gudang yang dipilih mencakup receiving, reserve, dan shipping. Sedangkan untuk alur operasinya menggunakan alur U. Kata kunci: perancangan kebutuhan, gudang transit.
Deskripsi Alternatif :In State Polytechnic of Bandung, there is no warehouse for public asset which will be disposed yet. Whereas, public asset should be safed physically before it is disposed. Therefore, State Polytechnic of Bandung needs transit warehouse for public asset which will be disposed. This project is to make transit warehouse design including overall structure, sizing and dimensioning, and operation strategy. Overall structure contains asset need analysis. Sizing and dimensioning is to design warehouse spacing and layout storage. Operation strategy contains warehouse operation with its flow. Project method which is used is descriptive method. Data collection techniques use observation, interview, and literature study. Observation is done directly to storage condition of public asset that will be disposed. Interview is done to warehouse administrator from each department. Literature study is based on administrator archives and theory. The project result shows that State Polytechnic of Bandung needs transit warehouse. In sizing and dimensioning, the result is 572 meter square warehouse spacing and 2.288 meter cubic warehouse volume with height 4 meter, aisle width 3 meter and using 125 pieces pallet in storage layout. Warehouse operation uses receiving, reserve, and shipping with U flow. Keywords: need design, transit warehouse.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Dr. Dra. Hennidah Karnawati, M.Si., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 135245010.pdf
(976619 bytes)
File : BAB 1 - 135245010.pdf
(360042 bytes)
File : BAB 2 - 135245010.pdf
(462669 bytes)
File : BAB 5 - 135245010.pdf
(87888 bytes)