Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2015

Studi Perencanaan Pemasangan Garpor (GP6) SKTM di Jalan Sekekukumbung 83A

Study Installation Planning Garpor (GP6) SKTM in Sekekukumbung Road 83A

Tugas Akhir, 039 / 2015 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2018-07-16 16:07:44
Oleh : Ario Suseno - 121321004 (ario_suseno@yahoo.com )
Dibuat : 2018-07-16, dengan 4 file

Keyword : Gardu distribusi, garpor (GP6), perencanaan pemasangan garpor, tahapan SOP pemasangan garpor, material dan komponen garpor.
Subjek : distribution substation, garpor (GP6), installation planning garpor, SOP stages installation garpor, materials and components garpor.

Dalam mendistribusikan energi listrik dibutuhkan gardu distribusi. Gardu distribusi mempunyai berbagai macam konstruksi. Salah satu diantaranya adalah garpor (GP6). Garpor merupakan gardu tipe tiang dengan menggunakan 2 tiang. Garpor termasuk dengan kategori gardu portal. Garpor mempunyai konstruksi yang berbeda, dimana garpor memiliki kubikel yang diletakkan pada gardu kios (metal clad). Garpor termasuk gardu dengan konstruksi baru, dan pembangunannya baru dimulai sekitar tahun 2011. Dalam membangun garpor dibutuhkan perencanaan pemasangan garpor yang baik. Diantaranya mengenai syarat pemasangan, tahapan SOP pemasangan, material dan komponen yang dibutuhkan dalam memasang garpor. Pada tugas akhir ini akan dijelaskan mengenai perencanaan pemasangan garpor SKTM yang tempatnya berada di jalan Sekekukumbung 83A. Dengan adanya penjelasan ini diharapkan dapat memberikan pengetahuan mengenai konstruksi dari garpor dan perencanaan pemasangan garpor. Kata kunci: Gardu distribusi, garpor (GP6), perencanaan pemasangan garpor, tahapan SOP pemasangan garpor, material dan komponen garpor.

Deskripsi Alternatif :

In distributing electrical energy required distribution substation. Distribution substations have various kinds of construction. One of them is garpor (GP6). Garpor is a pole-type substations by using two poles. Garpor including the substation portal category. Garpor has a different construction, where garpor have a cubicle that is placed on the kiosk substation (metal clad). Garpor including substations with new construction and construction began around 2011. In the build garpor required good installation planning of garpor. Among the terms of installation, mounting SOP stages, materials and components required in installing garpor. In this final project will explain the installation planning garpor SKTM that it is located on the road Sekekukumbung 83A. Given this explanation expected to provide knowledge about the planning and construction of garpor. Keywords: distribution substation, garpor (GP6), installation planning garpor, SOP stages installation garpor, materials and components garpor.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Drs. Dwi Asmono, M.Pd.

    Pembimbing 2: Ir. Dadang Hidayat, Editor: Erlin Arvelina

Download...