Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019
Analisis Struktur Beton Bertulang Pada Gedung Perkantoran PT Coca-Cola Bandung
Analysis Of Reinforced Concrete Structures On The Office Building PT Coca-Cola Bandung
Tugas Akhir, 021 / 2019 / KGEUndergraduate Theses from JBPTPPOLBAN / 2020-04-16 15:55:27
Oleh : Ayu Zata Amani - 161111033 & Evi Siti Mariam - 161111036 (ayuzataa@gmail.com)
Dibuat : 2020-04-16, dengan 4 file
Keyword : analisis struktur, beton bertulang, statik equivalen, SRPMK
Subjek : structures analysis, reinforced concrete, equivalent static, SMRFS
Gedung perkantoran PT Coca-Cola di Bandung dibangun sekitar tahun 1995, adapun dari tahun 1995 sampai saat ini peraturan dalam Teknik Sipil telah mengalami perkembangan. Tulisan ini membahas analisis struktur beton bertulang pada Gedung Perkantoran PT Coca-Cola Bandung dengan mengikuti peraturan saat ini. Dalam analisis struktur beton bertulang pada Gedung Perkantoran PT Coca-Cola Bandung, beban gempa pada bangunan ini diperhitungkan menggunakan beban gempa statik equivalen dengan Sistem Rangka Pemikul Momen Khusus (SRPMK). Analisis struktur beton bertulang pada bangunan ini menggunakan bantuan software analisis struktur (ETABS). Berdasarkan hasil perhitungan analisis struktur beton bertulang pada bangunan ini disimpulkan pelat lantai satu arah/kantilever yang terdapat pada lantai 2 tidak memenuhi tebal minimum, sedangkan untuk pelat dua arah yang terdapat pada lantai 1 jarak tulangan pelat tidak memenuhi persyaratan. Dalam bangunan ini terdapat empat tipe balok, yaitu tipe 300x650, 200x400, 250x500, dan 100x900. Berdasarkan perhitungan balok 250x500 tidak aman terhadap geser, dan semua tipe tidak memenuhi untuk penambahan tulangan torsi (penampang perlu diperbesar). Kemudian berdasarkan perhitungan dua tipe kolom K1 dan K2 tidak memenuhi syarat kekuatan kolom (strong column weak beam). Kata kunci: analisis struktur, beton bertulang, statik equivalen, SRPMK.
Deskripsi Alternatif :The PT Coca-Cola office building in Bandung was built in 1995, while from 1995 until the present the regulations in Civil Engineering have developed. This paper discusses the analysis of reinforced concrete structures at PT Coca-Cola's office building Bandung by following current regulations. In the analysis of reinforced concrete structures at PT Coca-Cola's office building Bandung, earthquake loads in this building are calculated using static equivalents by modeling the structure a Special Moment Resisting Frame System (SMRFS). It is done because the city of Bandung is included in the category of regions with high earthquake intensity. Analysis reinforced concrete structures in this building using the structural analysis software (ETABS). Based on the results of the calculation analysis reinforced concrete structures in this building, it was concluded that the one-way slab/cantilever is not suitable for the minimum thickness, while for the two-way slab the reinforcement distance is not suitable for the requirements. In this building there are four types of beams, namely type 300x650, 200x400, 250x500, and 100x900. Based on the calculation of the 250x500 beam it is not safe for shear, and all types not suitable for the addition of torque reinforcement (cross-section needs to be enlarged). Then, based on the calculation of two types of columns K1 and K2 not suitable with the column strength requirements (strong column weak beam). Keywords: structures analysis, reinforced concrete, equivalent static, SMRFS.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Heri Kasyanto, S.T., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 161111033 & 161111036.pdf
(1477932 bytes)
File : BAB 1 - 161111033 & 161111036.pdf
(292842 bytes)
File : BAB 2 - 161111033 & 161111036.pdf
(617185 bytes)
File : BAB 6 - 161111033 & 161111036.pdf
(174147 bytes)