Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2020
Penambahan Komponen Regenerator Pada Modifikasi Siklus Brayton Guna Meningkatkan Efisiensi Termal Dan Mengetahui Pengaruh Terhadap Losses Exergi Di PLTG UP Muara Tawar
The Addition of Regenerator Component to The Modification of The Brayton Cycle to Increase The Thermal Effisiensi and Knowing The Effect of Exergy Losses at PLTG UP Muara Tawar
Skripsi, 006 / 2020 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2022-04-01 11:26:53
Oleh : Bey Muhammad NIM: 161724004 (beymuhammad2@gmail.com ; bey.muhammad.tptl16@polban.ac.id)
Dibuat : 2022-04-01, dengan 4 file
Keyword : Regenerator, Exergi, Efisiensi Termal
Subjek : Regenerator, Exergy, Thermal Efficiency
Peningkatan efektifitas kerja suatu perusahaan perlu adanya perencanaan yang tepat pada operasionalnya, hal ini penting dalam mengetahui efisiensi dari suatu pembangkit listrik. Gas buang dari unit PLTG PT PJB UP Muara Tawar yang memiliki temperatur tinggi yang dapat dimanfaatkan kembali untuk meningkatkan efisiensi termal dengan menambahkan komponen regenerator. Penambahan komponen ini tidak rumit, mudah diaplikasikan serta tidak membutuhkan banyak tempat dibandingkan dengan menggabungkan siklus kombinasi turbin gas dan turbin uap menjadi (PLTGU). Nilai efisiensi termal dari PLTG dihitung menggunakan metode siklus Brayton. Tujuan dari modifikasi PLTG ini untuk mengetahui pengaruh terhadap losses exergi serta meningkatkan efisiensi termal pada Pembangkit Listrik Tenaga Gas (PLTG) 6x145 MW PT PJB UP Muara Tawar.
Deskripsi Alternatif :A company is need for good planning on operatinonal for to increase the effectiveness of the work and the knowing the efficiency of a power plant. The exhaust gas from the unit PLTG P.T PJB UP Muara Tawar has a still high temperature,that exhaust gas be able to be reused in increasing the thermal efficiency by adding regenerator component. This component are simple, easy to install and do not require a lot of space compared to combine the Combined Cycle of gas turbines and steam turbines into (PLTGU). Calculated value the thermal efficiency of PLTG using the methods brayton cycle. The purpose of the modification of this PLTG is to knowing the effect of the value losses of exergy and increase the thermal efficiency in the Gas Power Plant (PLTG) 6x145 MW PT PJB UP Muara Tawar.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Slameto, S.T., M.Eng.
Pembimbing 2: Alvera Apridalianti M., S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 161724004.pdf
(1282822 bytes)
File : BAB 1 - 161724004.pdf
(814780 bytes)
File : BAB 2 - 161724004.pdf
(383012 bytes)
File : BAB 5 - 161724004.pdf
(704529 bytes)