Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2012

RANCANG BANGUN MODULPRAKTIKUM PROTEKSI GANGGUAN ANTAR FASA PADASISTEM DISTRIBUSI MENGGUNAKAN RELAI SIEMENS 7SJ600

DESIGN AND BUILD PROTECTION EXPERIMENT MODULE OF INTERPHASE FAULT ON DISTRIBUTION SYSTEM

Tugas Akhir, 027 / 2012 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2015-11-18 09:21:47
Oleh : Bramantika Aji Priambodo - 091321005
Dibuat : 2013-05-06, dengan 4 file

Keyword : Gangguan Antar Fasa, Jaringan Distribusi, OCR
Subjek : Interphase Fault, Distribution System, OCR

Keandalan pada sistem distribusi tegangan menengah mudah sekali terpengaruh oleh gangguan-gangguan, seperti gangguan fasa ke tanah dan gangguan antar 2 fasa atau 3 fasa yang biasanya diakibatkan oleh petir,hewan,atau pepohonan sehingga menyebabkan gangguan pada jaringan yang menyebabkan kerusakan pada transformator maupun komponen lainya karena besarnya arus gangguan melebihi batas arus nominal komponen tersebut. Untuk mengamankan jaringan dari gangguan antar fasa maka diperlukan sebuah sistem proteksi, yaitu over current relay (OCR) yang digunakan untuk mengamankan jaringan dari gangguan hubung singkat, sehingga transformator maupun komponen lainya tetap aman walaupun terjadi gangguan antar fasa pada jaringand istribusi. Kata kunci: Gangguan Antar Fasa, Jaringan Distribusi, OCR

Deskripsi Alternatif :

The reliability on distribution system of medium voltage is very easy to influenced from disturbances, such as phase to ground disturbance and phase to phase or amongst 3 phases which is actually caused by thunder, animals, or trees so that cause a fault of system which can damage the transformer or other component because enormity of disturbance current surpass the limit of nominal current of that component. To secure system from amongst phases disturbance so itÂ’s required a system of protection, namely over current relay (OCR) which is used for securing system from short circuit disturbance, so the transformer or other component still safe although disturbance amongst phases occurs on system distribution. Keywords: Interphase Fault, Distribution System, OCR

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Supriyanto, ST., MT.


    Pembimbing 2: Yudi Prana Hikmat, ST., MT. , Editor: Erlin Arvelina

Download...