Perancangan Anggaran Biaya dan Penjadwalan untuk Pelaksanaan Struktur Atas pada Proyek Indonesia Navy Club Pantai Mutiara Jakarta Utara

Budget Planning and Scheduling for Implementation Upper Structure on Indonesia Navy Club Project Pantai Mutiara North Jakarta

Skripsi, 008 / 2021 / TPPG
Undergraduate Theses from JBPTPPOLBAN / 2022-09-23 13:28:51
Oleh : Cantika Dewi Putri - 171144008 & Widia Sofriani Putri - 171144032 (cantika.dewi.tppg17@polban.ac.id)
Dibuat : 2022-09-23, dengan 4 file

Keyword : RAB, Penjadwalan, Struktur Atas
Subjek : Budget Plan, Scheduling, Upper Structure

Proyek Indonesia Navy Club Pantai Mutiara Jakarta Utara merupakan club house pertama di Indonesia yang akan dikelola oleh One15° Marina memiliki luas bangunan 12.202 m2 terdiri atas 4 lantai dan1 lantai basement yang dibangun dengan struktur beton bertulang. Pelaksanaan struktunya menggunakan sistem bekisting konvensional. Pada pembangunan gedung bertingkat biaya yang diperlukan untuk bekisting sangat berpengaruh, mencapai kisaran 40% - 60% dari biaya pekerjaan beton (Hanna,1999). Pembangunan proyek Indonesia Navy Club Pantai Mutiara Jakarta Utara direncanakan mulai 5 Maret 2018, namun pelaksanaannya mengalami penundaan pekerjaan. Hal tersebut akan mempengaruhi jadwal rencana dan anggaran biaya pembangunan. Dalam tugas akhir ini, penulis melakukan perancangan anggaran biaya dan penjadwalan untuk pelaksanaan struktur atas proyek Indonesia Navy Club Pantai Mutiara Jakarta Utara yang meliputi pekerjaan elemen struktur kolom, balok serta pelat lantai menggunakan bekisting yang berulang sebanyak 3 kali pemakaian. Perancangan anggaran biaya dari perhitungan bill of quantity berdasarkan gambar for construction, dan AHSP yang berpedoman pada Lampiran peraturan Menteri PUPR No.28 Tahun 2016. Penjadwalan menggunakan metode pelaksanaan pekerjaan struktur atas berdasarkan waktu siklus pengecoran lantai dengan 2 tingkat bekisting untuk menghasilkan keefektifan jadwal sehingga dapat mewujudkan keberhasilan suatu proyek konstruksi. Hasil yang diperoleh berdasarkan 3 kali penggunaan bekisting yang berulang menghasilkan rancangan anggaran biaya sebesar Rp14.678.861.889 sudah termasuk biaya overhead dan profit sebesar 15% serta PPN sebesar 10% dengan total waktu pelaksanaan selama 61 hari. Kata Kunci: RAB, Penjadwalan, Struktur Atas.

Deskripsi Alternatif :

The project of Indonesian Navy Club, Pantai Mutiara at North Jakarta is the first club house in Indonesia to be managed by One15° Marina. It has a build area with 12.022 m2 consisting of four floors and one basement built with reinforced concrete structures. The implementation structure used conventional formwork system. In the upper buildings construction, the cost for formwork is very influential ranges from 40%-60% of the cost of concrete work (Hanna,1999). The planning of project construction to begin March 5 2018 and the implementation of work has been delayed. That situation will be affecting the schedule and budget construction, and then budget planning and proper scheduling are needed to prevent delay in construction. In this final assignment, the authors budget planning and scheduling using the upper structure work implementation of the Indonesian Navy Club Pantai Mutiara North Jakarta project which includes the work of the column, beam and floor slab structure with 3 times using repeated formwork from the bill of quantity calculation based on for construction drawings, and AHSP which is guided on the Attachment of PERMEN PUPR No. 28 of 2016. Scheduling using the method of carrying out upper structure work method based on 2 levels of formwork and the implementation schedule based on the casting cycle time to produce for the effectiveness of a schedule and more budget economically. So it can realize the success of construction projects. That was obtained based on 3 times repeated using formwork and the resulting budget is Rp14,678,861,889 including 10% VAT and then the total time for the upper structure work is 61 days. Keywords: Budget Plan, Scheduling, Upper Structure

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ujang Ruslan, S.T., M.T.

    Pembimbing 2: Ahmad Solih, S.T., M.T., Editor: Erlin Arvelina

Download...