Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2021

Perancangan Cooling Water System (CWS) Eksternal sebagai Pendingin Generator Lubricant Oil Pump (GLOP) pada PLTM Kalapa Nunggal

Design of External Cooling Water System (CWS) As Generator Lubricant Oil Pump (GLOP) Cooling at Minihydro Plant Kalapa Nunggal

Skripsi, 008 / 2021 / TPTL
Undergraduate Theses from JBPTPPOLBAN / 2022-11-29 10:42:25
Oleh : Cintya Dwi Agustina - 171724006 (cintya.dwi.tptl17@polban.ac.id)
Dibuat : 2022-11-29, dengan 4 file

Keyword : Cooling Water System (CWS), Debit, Head Tank, Head Loss, Generator Lubricant Oil Pump (GLOP), Pipa Penyalur
Subjek : Cooling Water System (CWS), Flow Rate, Head Tank, Head Loss, Generator Lubricant Oil Pump (GLOP), Pipeline

Pemenuhan kebutuhan listrik dengan menggunakan energi terbarukan merupakan suatu solusi yang menjanjikan karena ketersediaannya yang berlimpah dialam. Menurut data kementrian ESDM pada tahun 2019, energi terbarukan terkhusus air yang baru dimanfaatkan baru 5,18 Gigawatt (GW) dari total ketersediaan 75 Gigawatt (GW). Salah satu pembangkit yang memanfaatkan energi terbarukan yaitu Pembangkit Listrik Tenaga Mini Hidro (PLTM) Kalapa Nunggal dengan kapasitas 2×1500 kWatt yang memanfaatkan air untuk memutar turbin yang terkopel dengan generator dalam produksi listrik. Putaran turbin yang terkopel dengan generator akan mengakibatkan bantalan mengalami peningkatan temperatur, sehingga dibutuhkan sistem pendinginan. Sistem pendingin bantalan turbin generator disebut cooling water system (CWS) yang dimanfaatkan untuk mendinginkan Generator Lubricant Oil Pump (GLOP). Penelitian ini ditunjukkan untuk merancangan model Cooling Water System (CWS) Eksternal dengan sumber air yang ditampung di head tank dan dialirkan menggunakan pipa menuju GLOP. Batasan masalah pada penelitian ini yaitu tingkat kejernihan air diukur dengan ukuran sampah alam maksimal sebesar 0,5 mm yang mana air akan ditampung dalam head tank dengan kapasitas penampungan air hingga 8,474 m3. Cooling Water System (CWS) Eksternal yang ditunjukkan untuk mendinginkan beban pendingin 75,332 kWatt membutuhkan pipa air berukuran 90 NB untuk menghasilkan debit air 6,384×10-4 m3/s. Sistem pemipaan yang menghubungkan sumber air dengan CWS membutuhkan dua sistem perpipaan dengan panjang 48,6 m dan 250,18 m dengan nilai head loss masing-masing sambungan pipa adalah 6,712×10-3 m dan 3,66×10-3 m.

Deskripsi Alternatif :

Fulfilling electricity needs by using renewable energy is a promising solution because of its abundant availability in nature. According to data from the Ministry of Energy and Mineral Resources in 2019, renewable energy, especially water that has just been used, is only 5.18 Gigawatts (GW) of the total availability of 75 Gigawatts (GW). One of the plants that utilizes renewable energy is Mini Hydro Power Plant (PLTM) Kalapa Nunggal with a capacity of 2x1500 kWatt which utilizes water to turn a turbine coupled to a generator in the production of electricity. The turbine rotation coupled with the generator will cause the bearing to increase the temperature, so a cooling system is needed. The turbine generator bearing cooling system is called a cooling water system (CWS) used to cool the Generator Lubricant Oil Pump (GLOP). This research is shown to design the External Cooling Water System (CWS) model with the water source accommodated in the head tank and flowed using a pipe to GLOP. The problem limitation in this study is the level of water clarity is measured by the maximum size of natural waste of 0,5 mm where the water will be accommodated in the head tank with water storage capacity of up to 8.474 m3. The External Cooling Water System (CWS) shown to cool a cooling load of 75.332 kWatt requires a water pipe measuring 90 NB to produce the flow rate of 6.384x10-4 m3/s. The piping system that connects the water source to the CWS requires two piping systems with the length of 48.6 m and 250.18 m with the head loss values of 6.712x10-3 m and 0.0366m each pipe connection.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Drs. Dja’far Sodiq, S.T., M.T.

    Pembimbing 2: Ika Yuliyani, S.T., M.T., Editor: Erlin Arvelina

Download...