Path: Top > Skripsi - D4 > 2017 > Jurusan Administrasi Niaga > Program Studi Manajemen Aset > KERMA > 2017

Perencanaan Kebutuhan Gudang Transit Penghapusan Bagian Umum dan Perlengkapan (BAGUMPAL) Kota Bandung

The Need Planning Of Disposal Transite Warehouse Of BAGUMPAL Bandung City Government

Tugas Akhir, 002 / 2017 / MAS-KERMA
Undergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:17
Oleh : Defrika Rahman - 135246003 (defrikarahman@yahoo.co.id)
Dibuat : 2017-10-10, dengan 4 file

Keyword : Kebutuhan Sarana dan Prasarana Gudang, Estimasi Biaya
Subjek : Needs of Warehouse Facilities and Infrastructure, Cost Estimates

Gudang Transit Penghapusan Bagian Umum dan Perlengkapan dibangun sebagai tempat penyimpanan barang di Pemerintah Kota Bandung. Namun terdapat berbagai masalah kerusakan pada fisik aset, tingginya tingkat penggunaan aset, tidak lengkapnya fasilitas aset, serta adanya penumpukan barang di luar gudang. bekenaan dengan hal tersebut, perlu dilakukan kajian perencanaan kebutuhan aset gudang transit penghapusan. Tujuan proyek ini untuk mengetahui: perencanaan kebutuhan sarana dan prasaran gudang transit penghapusan Bagian Umum dan Perlengkapan Kota Bandung dan besarnya biaya yang dibutuhkan untuk pembangunan gudang transit penghapusan Bagian Umum dan Perlengkapan Kota Bandung. Landasan teori yang digunakan adalah perencanaan kebutuhan aset dan estimasi biaya. Objek proyek ini adalah lahan dan bangunan gudang milik Bagian Umum dan Perlengkapan Kota Bandung yang berada di Jl. Sadang Serang No 18 A, Coblong , Kota Bandung. Luas lahan objek tersebut adalah 1.016 m2 dan luas bangunan 540 m2. Metode penelitian yang digunakan pada proyek ini adalah metode deskriptif. Teknik pengumpulan data yang digunakan meliputi observasi, wawancara dan studi dokumentasi. Hasil dari proyek ini adalah kebutuhan sarana dan prasarana gudang transit penghapusan, serta total biaya yang di butuhkan untuk pembangunan gudang transit penghapusan Bagian Umum dan Perlengkapan Kota Bandung adalah sebesar Rp.2.553.560.842.- Kata Kunci: Kebutuhan Sarana dan Prasarana Gudang, Estimasi Biaya.

Deskripsi Alternatif :

Warehouse Transit Elimination of General Parts and Equipment is built as a storage of goods in the Government of Bandung. However, there are various problems of physical damage to assets, high level of asset use, incomplete asset facilities, and the accumulation of goods outside the warehouse. With regard to this matter, it is necessary to study the planning of transit warehouse asset needs. The purpose of this project is to know: the planning of transit warehouse facilities and equipment needs of the removal of General Section and Bandung City Equipment and the amount of cost required for the construction of transit warehouse removal of General and Equipment Bandung. The theoretical basis used is planning asset needs and cost estimation. The object of this project is the land and building warehouse belonging to the General and Equipment Bandung City located on Jl. Sadang Serang No 18 A, Coblong, Bandung City. The land area of the object is 1,016 m2 and the building area is 540 m2. The research method used in this project is descriptive method. Data collection techniques used include observation, interview and documentation study. The result of this project is the need of transit warehouse facilities and infrastructure, as well as the total cost needed for the construction of the transit warehouse for the removal of the General Section and Equipment of Bandung is Rp.2.553.560.842.- Keywords: Needs of Warehouse Facilities and Infrastructure, Cost Estimates.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Dra. Nurlaila Fadjarwati, M.Si., Editor: Erlin Arvelina

Download...