Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2021
Perancangan Sistem PLTS Terpusat untuk Penerangan Jalan Perumahan Gading Junti Asri Kabupaten Bandung
Design of Centralized Solar Powerplant System for Public Street Lighting in Gading Junti Asri Residence of Bandung District
Skripsi, 009 / 2021 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2022-11-29 10:45:19
Oleh : Deka Paksi Manggala - 171724007 (deka.paksi.tptl17@polban.ac.id)
Dibuat : 2022-11-29, dengan 4 file
Keyword : PLTS, panel surya, penerangan jalan umum, simulasi
Subjek : Solar power system, PV panel, public street lighting, simulation
Energi matahari dikenal oleh banyak orang sebagai sumber energi terbarukan yang ramah lingkungan dan tidak akan habis selama matahari terus bersinar. Perumahan Gading Junti Asri terletak di daerah Kabupaten Bandung, diketahui sudah menggunakan sistem penerangan jalan umum (PJU) dengan sumber daya dari grid utama milik PLN. Namun, terdapat permasalahan di mana sistem tersebut hanya tersedia di jalan utama saja dan beberapa jalan kecil di daerah pinggiran perumahan tidak terpasang sehingga menyulitkan pengendara bila melewati jalan tersebut. Penelitian ini bertujuan untuk merancang sebuah sistem Penerangan Jalan Umum Tenaga Surya (PJUTS) konfigurasi terpusat DC konvensional di Perumahan tersebut dari segi teknis dan ekonomisnya. Perancangan dilakukan dengan menentukan kebutuhan penerangan PJU dan rancangan teknis PLTS terpusat, merancang rute jaringan serta menghitung jatuh tegangan tiap titik beban, analisa ekonomi metode NPV dan Payback Period, dan simulasi rancangan menggunakan software PVSYST dan DIALUX. Dari hasil perancangan dibutuhkan lampu LED dengan besar lumen 3700 lumen, 1800 lumen dan 1900 lumen di tiap jalan berbeda agar mencapai penerangan PJUTS dengan iluminasi sebesar 5 lux. Rancangan teknis PLTS terpusat membutuhkan 32 panel surya 205 Wp, 1 unit SCC 8,26 kWp/60 A, dan 60 unit baterai 2V dengan tegangan kerja 120VDC untuk memenuhi kebutuhan daya sebesar 20,87 kWh/hari. Drop tegangan pada jaringan distribusi tiap titik beban sudah memenuhi standar (<5%). Dari segi ekonomi didapat nilai NPV>0 sehingga investasi ini layak, dengan Cost of Energy sebesar Rp. 7.559,00/kWh. Investasi tersebut memperoleh tingkat pengembalian yang sama dengan tingkat diskonto dan payback period < umur proyek yaitu 17 tahun atau 193,08 bulan. Kata kunci: PLTS, panel surya, penerangan jalan umum, simulasi.
Deskripsi Alternatif :Solar energy is known by many as one of renewable energy sources that's environmental-friendly and won't run out as long as the sun continues to shine. Gading Junti Asri residence, which located in Kabupaten Bandung area, is known to have used a Public Street Lighting system (PSL) with main source of power from main grid owned by PLN. However, there is a problem where the system only available on main road, and several small roads in residential suburbs aren't installed with PSL, making it difficult for motorists to pass through the road. This study discussed about design of conventional DC centralized Public Street Lighting Solar Power system (PSLSP) in these residence from technical and economic perspective. The design is done by determining lighting needs of PSL and deciding technical design of centralized solar power system, designing network route and calculating voltage drop at each load point, analyzing NPV and Payback Period economic methods, and simulating design by using PVSYST and DIALUX software. From the design results, LED lamps with 3700 lumens, 1800 lumens and 1900 lumens were needed on different roads in order to achieve PSLSP lighting with an illumination of 5 lux. The centralized solar power system technical design require 32 solar panels of 205 Wp, 1 unit of solar charge controller of 8.26 kWp/60 A, and 60 units of 2V batteries with a nominal voltage of 120 VDC to meet the power requirement of 20.87 kWh/day. The voltage drop on the distribution network for each load point has met the standard (<5%). Lastly from an economic design, NPV value > 0 which means this investment is feasible, with a Cost of Energy of Rp. 7,559,00/kWh. The investment earns rate of return equal to discount rate and payback period < project's life, precisely 17 years or 193.08 months. Keywords: Solar power system, PV panel, public street lighting, simulation.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ir. Sri Paryanto Mursid, M.Sc.
Pembimbing 2: Yanti Suprianti, S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 171724007.pdf
(788880 bytes)
File : BAB 1 - 171724007.pdf
(91668 bytes)
File : BAB 2 - 171724007.pdf
(1005093 bytes)
File : BAB 5 - 171724007.pdf
(71008 bytes)