Audit Energi Sistem Kelistrikan di The Imperium International Hotel
Energy Audit of Electrical System at The Imperium International Hotel
Tugas Akhir, 048 / 2014 / TENUndergraduate Theses from JBPTPPOLBAN / 2018-04-20 11:23:27
Oleh : Destya Aris Yulianti - 111711008 (destyaaris@gmail.com)
Dibuat : 2018-04-20, dengan 4 file
Keyword : audit energi, sistem keandalan
Subjek : energy audit, reliability system
Audit energi merupakan teknik yang digunakan untuk menghitung besarnya konsumsi energi pada bangunann gedung dan mengenali cara-cara penghematannya. Audit energi dilakukan di The Imperium International Hotel dengan fokus pada sistem kelistrikan. Intensitas Konsumsi energi pada gedung hotel sebesar 133,9 [kWh/m2/tahun]. Intensitas Konsumsi Energi dapat diturunkan dengan konservasi dan menejemen energi. Penyeimbangan beban dilakukan dengan metode konfigurasi jaringan radial sehingga meningkatkan sistem keandalan. Penyeimbangan beban ini menurunkan nilai IKE sebesar 132,17 kWh/m2/tahun. Penggantian kabel dengan NYA 1x10mm2 dapat menurunkan jatuh tegangan dan menurunkan IKE menjadi 131,97 kWh/m2/tahun Langkah peluang penghematan energi yang dilakukan adalah pemasangan kapasitor bank dengan kapasitas 15 kVA. Pemasangan kapasitor menurunkan IKE menjadi 121,37 kWh/m2/tahun. Kata kunci: audit energi, sistem keandalan.
Deskripsi Alternatif :Energy audit is a technique used to calculate the amount of energy consumption in buildings and to recognize how its savings. The energy audit was done on The Imperium International Hotel focused on the electrical system. The intensity of energy consumption in hotel buildings was 133,9 kWh/m2/year. The intensity of energy consumption can be reduced by conservation and energy management. These load balancing was done by the radial network configuration method thereby could increase reliability system. This load balancing reduce reduce the value of IKE to 132,17kWh/m2/year. Energy saving opportunities were done by installing capasitor bank with 15 kVA in capacities. Changing cable to NYA 1x10mm2 can reduce voltage drop and decrease IKE to 131,97kWh/m2/year. The installation of capasitor bank lower IKE be 121,37 kWh/m2/year. Keywords: energy audit, reliability system.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Ir. Kholiq Hernawan, M.T., Editor: Erlin Arvelina
Download...
File : DAFTAR - 111711008.pdf
(483963 bytes)
File : BAB 1 - 111711008.pdf
(173792 bytes)
File : BAB 2 - 111711008.pdf
(549506 bytes)
File : BAB 5 - 111711008.pdf
(163379 bytes)