Perencanaan Turbin Pelton pada Pembangkit Listrik Tenaga Minihidro (PLTM) Koro-Kabalo di Sungai Koro -Kabalao
Pelton Turbine Planning at The Koro-Kabalo Minihydro (PLTM) Power Plant on the Koro-Kabalao River
Skripsi, 011 / 2021 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2022-11-29 10:51:58
Oleh : Edwin Jeni Arwansa - 171724009 (jeniedwin62@gmail.com)
Dibuat : 2022-11-29, dengan 4 file
Keyword : PLTM Karo Kabalo, Turbin Pelton , Perencanaan
Subjek : Karo Kabalo PLTM, Pelton Turbine, Planning
Salah satu upaya agar keluar dari ketergantungan enegrgi bahan bakar fosil adalah dengan mengembangkan energi baru terbarukan khususnya energi air yang dikembangkan dalam skala minihidro. Disungai Karo Kabalo, yang terletak di Kabupaten Tujo Una â Una, Sulawesi Tengah dapat dijadikan salah satu tempat yang potensial untuk dibangun sebuah pembangkit listrik tenaga minihidro dengan data perencanaan awal dengan yaitu Head setinggi = 480 m, debit operasi per unit (Q) =1.39m^3âs,dan debit desai untuk setiap turbin adalah 0,7 m^3âs. Perencanaan turbin yang akan dibuat adalah menghitung parameter â parameter untuk mendapatkan dimensi â dimensi utama pada turbin pelton. Perhitungan mengacu pada acuan buku Micro Pelton Turbines. Turbin yang dirancang adalah turbin pelton dengan 21 jumlah bucket dengan diameter runner (D) sebesar 0.8325 m, yang memiliki diameter poros (DP) 0.2815 dan diameter dari nozzle Sebesar 0.068 m. Jenis turbin yang dirancang adalah turbin pelton dengan poros horizontal sebanyak 2 buah ,dengan daya keluaran/unit (Pt) 2801 KW (2.8 MW) , Putaran turbin (N) 1000rpm, efisiensi turbin (ηt) 0.85 , (ns) 23.56 rpm (m-kW). Kata kunci: PLTM Karo Kabalo, Turbin Pelton , Perencanaan.
Deskripsi Alternatif :One of the efforts to get out of the dependence on fossil fuels is to develop new renewable energy, especially water energy developed on a minihydro scale. Insungai Karo Kabalo, located in Tujo Una â Una Regency, Central Sulawesi can be used as one of the potential places to build a minihydro power plant with initial planning data with head as high as 480 m, operating discharge per unit (Q) = 1.39,m-3.-s.,and desai discharge for each turbine is 0.7,,m-3.-s.. The planning of the turbine to be made is to calculate the parameters - parameters to get the main dimensions on the pelton turbine. The calculation refers to the reference book Micro Pelton Turbines. The designed turbine is a pelton turbine with 21 bucket counts with a runner diameter (D) of 0.8325 m, which has a shaft diameter (DP) of 0.2815 and a diameter of 0.068 m. The type of turbine designed is a pelton turbine with a horizontal shaft of 2 pieces, with output power / unit (Pt) 2801 KW (2.8 MW), turbine rotation (N) 1000rpm, turbine efficiency (ηt) 0.85, (ns) 23.56 rpm (m-kW). Keywords: Karo Kabalo PLTM, Pelton Turbine, Planning.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ir. Wahyu Budi Mursanto, M.Eng.
Pembimbing 2: Apip Pudin, M.Si., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 171724009.pdf
(1135844 bytes)
File : BAB 1 - 171724009.pdf
(219767 bytes)
File : BAB 2 - 171724009.pdf
(657194 bytes)
File : BAB 5 - 171724009.pdf
(63745 bytes)