Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2014 > NON-REGULER
Desain Peningkatan Daya Dukung Tanah Lunak pada Pembangunan Jalan Akses PLTU Ketapang, Kalimantan Barat
Soil Improvement Design on the Construction of PLTU Ketapang Access Roads, West Kalimantan
Tugas Akhir, 002 / 2014 / TPJJ-PPLUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:06:05
Oleh : Elisa - 121137004 (chibielisa@gmail.com)
Dibuat : 2017-08-01, dengan 4 file
Keyword : Daya dukung, Penurunan, PVD, Preloading
Subjek : Bearing capacity, Settlement, PVD, Preloading
Di Desa Sukabangun Dalam, Ketapang, Kalimantan Barat direncanakan pembangunan sebuah Pembangkit Listrik Tenaga Uap (PLTU) untuk membantu menyediakan tenaga listrik tambahan di daerah tersebut. Selain pembangunan PLTU, akan dibangun pula jalan akses disekitar PLTU untuk menunjang kegiatan di areal PLTU Ketapang. Pembangunan jalan akses untuk areal PLTU tersebut sangat penting dan perlu direncanakan dengan seksama. Tanah sebagai landasan jalan tersebut harus mampu memikul beban perkerasan dan lalu lintas diatasnya. Namun, areal lokasi yang berada disekitar muara Sungai Pawan membuat kondisi tanah menjadi sangat lunak akibat kandungan organik dari pembusukan tanaman dan muka air tanah yang tinggi. Untuk mengetahui kondisi, tanah dilakukan penyelidikan tanah di lapangan dan di laboratorium. Kemudian, hasil penyelidikan tersebut dianalisis. Berdasarkan analisis tersebut, diperoleh bahwa besarnya beban yang didistribusikan kedalam lapisan tanah dasar adalah sebesar 4,873 ton/m2. Beban ini melebihi daya dukung izin tanah pada lapisan permukaan, yaitu 1,235 ton/m2 dan total penurunan tanah yang terjadi sebesar 159,390 cm melebihi batas izin sebesar 2,54 cm dengan waktu konsolidasi 552 hari. Dengan demikian, perlu dilakukan usaha untuk meningkatkan daya dukung tanah tersebut. Karya tulis ini akan menjelaskan usaha peningkatan daya dukung tanah dengan cara mengkombinasikan Prefabricated Vertical Drain (PVD) dan preloading untuk memperpendek jalur aliran air sehingga mempercepat periode konsolidasi tanah. Dari usaha peningkatan daya dukung tersebut didapatkan dimensi PVD 10 Ã 0,4 cm, panjang pemasangan PVD 20 m, spasi pemasangan PVD 1,5 m, tinggi timbunan (sebagai beban preloading) 2,53 m serta lama waktu untuk mencapai konsolidasi 90% adalah 36 hari. Tinggi timbunan akhir diharapkan >0,5 m dari muka air banjir pada lokasi, dalam hal ini ketinggian akhir mencapai 0,936 m Kata kunci: Daya dukung, Penurunan, PVD, Preloading.
Deskripsi Alternatif :At Desa Sukabangun Dalam, Ketapang, West Kalimantan a steam power plant is planned to be built to supply the electrical needs from surrounding area. Also, beside the steam power plant, the road access surrounding the plant will be built in order to support the activities of the steam power plant at Ketapang.The construction of road access to the steam power plant is very important and must be planned with full consideration as the groundwork soil of the road is required to be able to resist the loading from pavement selfweight and traffic loads. But, the area, which is located near Pawan River's delta, makes the soil conditions become very soft due to the organic contents from vegetation decomposition and high ground water level. To determine the soil conditions, soil investigations were conducted both at the field and laboratory. The investigation results were analyzed and reported then. Based on the analysis, the magnitude of load distributed into the subsoil base is 4,873 ton/m2. This load exceeds the bearing capacity of the soil surface layer, that is 1,235 ton/m2 and results a total settlement of 159,390 cm, surpassing the allowable settlement of 2.54 cm in consolidation period of 552 days. Therefore, some efforts to improve the soil conditions are required to be conducted. This writing will explained the soil improvement effort by combining prefabricated vertical drain (PVD) and preloading to shortening the water flow's lane and then accelerate the soil consolidation period. From the soil improvement, the dimension of PVD are 10-0,4 cm, length of PVD installation 20 m, with installation space 1,5 m, and height of embankment (as preloading) 2,53 m which takes the duration in 36 days for 90% consolidation. The final height of embankment are expected greater than 0,5 m from flood water level in the location, in this case the final height are 0,936 m. Keywords: Bearing capacity, Settlement, PVD, Preloading.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Hendry, Dip.Ing.HTL., M.T., Editor: Erlin Arvelina
Download...
File : DAFTAR - 121137004.pdf
(1244167 bytes)
File : BAB 1 - 121137004.pdf
(306975 bytes)
File : BAB 2 - 121137004.pdf
(629494 bytes)
File : BAB 6 - 121137004.pdf
(1877262 bytes)