Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2013
Simulator Pengaruh Kebocoran Arus pada Instalasi Rumah Tinggal terhadap KWh Meter Analog
Simulator of Current Leakage Influence on Haouse Keeping Installation Against Indicating of Conventional KWh Meter
Tugas Akhir, 093 / 2013 / TLIUndergraduate Theses from JBPTPPOLBAN / 2017-05-18 17:17:45
Oleh : Fachri Fadli - 101321046 (gerry24dendhi@gmail.com)
Dibuat : 2017-05-18, dengan 4 file
Keyword : kebocoran arus, KWh meter analog
Subjek : current leakage, KWh meter analog
Dalam pemakaian energi listrik tidak dapat ditinjau dari masalah kWh saja, tetapi dalam instalasinya pun sangat berpengaruh. Jika instalasi tidak benar maka tidak menutup kemungkinan akan terjadi kebocoran arus dalam instalasinya sehingga terjadi kenaikan dalam penggunaan energi listrik yang akan terlihat pada pembacaan kWh meter. kWh meter yang digunakan adalah kwh meter konvensional. PLN membuat perubahan dalam kWh meter yaitu kWh meter digital. kWh meter digital diharapkan dapat meningkatkan kualitas pengukuran energi terutama dalam segi akurasinya lebih akurat dari pada kwh meter konvensional. Namun dalam analisa ini akan menggunakan kwh meter konvensional 1 fasa. Metoda pada proyek akhir ini dimulai dengan persiapan, pelaksanaan, pengujian, penyusunan laporan dan presentasi. Dari permasalahan tersebut diperlukan analisa dalam segi instalasinya, karena jika instalasi pada rumah tinggal tersebut tidak benar maka akan berpengaruh terhadap penunjukan kWh meter. Analisa pengukuran yang dilakukan yaitu dengan mengukur pembebanan yang sama pada modul simulator dengan kWh meter konvensional. Pengujian ini dilakukan seperti pembebanan rumah tangga, kemudian diukur jumlah pemakaian per hari dan per bulannya. Dari hasil pengukuran bahwa jumlah pemakaian energi pada kondisi tidak normal (arus bocor) akan lebih besar dari pada jumlah pemakaian energi pada kondisi normal. Kata kunci: kebocoran arus, KWh meter analog.
Deskripsi Alternatif :In the use of electrical energy can not be evaluated only from kwh problems , but in the installation was very influential. If the installation is not correct then it is probably not accurate in kwh meter readings. Kwh meter used is conventional kwh meter. PLN to make changes in kwh meter, is a digital electric work. Kwh meter digital is expected to improve the quality of energy, especially in terms of measurement accuracy is more accurate than the conventional kwh meter. However, in this analysis will use a conventional 1-phase kwh meter. Method at the final of the project began with the preparation, implementation, testing, preparation of reports and presentations. Of these problems required analysis in terms of installation, because if the installations at home is not true then it will affect the designation of kwh meters. Analysis of the measurements made with the same loading gauge on modules kWh meter with a conventional simulator. The test is performed as loading household, then measured the amount of usage per day and per month. From the measurement results that the amount of energy consumption in abnormal conditions (leakage current) will be greater than the amount of energy consumption under normal conditions. Keywords: current leakage, KWh meter analog.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ir. Hari Purnama, M.Eng.
Pembimbing 2: Trisnawiyana, S.ST., M.Eng., Editor: Erlin Arvelina
Download...
File : DAFTAR - 101321046.pdf
(883778 bytes)
File : BAB 1 - 101321046.pdf
(291833 bytes)
File : BAB 2 - 101321046.pdf
(588042 bytes)
File : BAB 5 - 101321046.pdf
(299583 bytes)