Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019
Perancangan Ulang Struktur Bawah Rumah Sakit Edelweiss Bandung
Redesign Of Bottom Structure At Edelweiss Hospital Bandung
Tugas Akhir, 024 / 2019 / KGEUndergraduate Theses from JBPTPPOLBAN / 2020-04-16 16:15:32
Oleh : Fairuz Arifah Ghassani - 161111037 & Tanty Solekha - 161111060 (tanty.soleha@gmail.com)
Dibuat : 2020-04-16, dengan 4 file
Keyword : daya dukung, tiang pancang, persiapan, pondasi, pile cap
Subjek : carrying capacity, pile, preparation, foundation, pile cap
Proyek yang ditinjau adalah Proyek Pembangunan Rumah Sakit Bandung yang dibangun oleh PT. Insan Mulia Land sebagai kontraktor terletak di jalan Soekarno-hatta No.550, Bandung.Proyek ini memiliki total luas 15.986 m². Perencanaan pondasi yang digunakan pada proyek ini menggunakan pondasi bored pile dikarenakan kedalaman tanah kerasnya yang cukup dalam yaitu pada kedalaman ± 28 m dengan jenis tanah lanau. Pada saat pelaksanaan pekerjaan pondasi, terjadi keterlambatan selama 3 bulan, menimbang agar tidak terjadi kerugian biaya dan waktu pembangunan tersebut, untuk mempercepat waktu pengerjaan, maka kami melakukan perencanaan ulang struktur bawah pada proyek pembangunan Pembangunan Rumah Sakit Bandung ini dengan menggunakan pondasi tiang pancang. Perencanaan pondasi pada proyek ini menghitung daya dukung pondasi berdasarkan kekuatan bahan dan data uji lapangan Standard Penetration Test (SPT) dengan menghitung daya dukung pondasi dengan Metode Meyerhof dan Metoda API (American Petroleum Institute), kemudian perhitungan efisiensi grup tiang menggunakan Metode Converse-Labarre, perhitungan penurunan menggunakan Metode Vesic 1970 dan Vesic 1977, perhitungan kontrol terhadap geser pons sesuai dengan persyaratan SNI 03-28472013, perhitungan daya dukung lateral menggunakan Metode Broms dan perhitungan penulangan pile cap sesuai dengan Diktat Kuliah Struktur Beton Dasar, yang kemudian hasil perhitungan tersebut dibandingkan dengan beban struktur atas yang menumpu pada pondasi. Dari hasil perhitungan yang penulis lakukan, didapat pondasi tiang pancang dengan diameter 0,65 m. Terdapat 2 tipe pondasi yang terdiri dari 4 tiang dan 6 tiang. Dan tipe pile cap joint 18 menggunakan tulangan atas D19-200 untuk arah x dan y dan tulangan bawah D19-200 untuk arah x dan y, tipe pile cap joint 48 menggunakan tulangan atas D19-125 untuk arah x dan y dan tulangan bawah D19-125 untuk arah x dan y. Semua tipe pondasi memenuhi kriteria aman terhadap daya dukung ijin, aman terhadap penurunan dan aman terhadap pergeseran. Kata Kunci: daya dukung, tiang pancang, persiapan, pondasi, pile cap.
Deskripsi Alternatif :The project reviewed was the Bandung Hospital Development Project which was built by PT. Insan Mulia Land as a contractor is located on Soekarno-Hatta Road No.550, Bandung. The project has a total area of 15,986 m². The foundation planning used in this project uses bored pile foundation due to the depth of the hard soil which is quite deep at ± 28 m depth with the type of silt soil. At the time of carrying out the foundation work, there was a delay of 3 months, considering that there was no loss in costs and time of the construction, to speed up the construction time, then we re-planned the structure under the construction of the Bandung Hospital Development project using a pile foundation. The foundation planning in this project calculates the bearing capacity of the foundation based on the strength of the material and the Standard Penetration Test (SPT) field test data by calculating the bearing capacity of the foundation with the Meyerhof Method and the API Method (American Petroleum Institute), then calculation of the pile group efficiency using the Converse-Labarre Method, calculation of settlement using Vesic Method 1970 and Vesic 1977, calculation of control of shear punches in accordance with the requirements of SNI 03-28472013, calculation of lateral bearing capacity using the Broms Method and calculation of pile cap reinforcement in accordance with Basic Concrete Structure Lecture Dictation, which then the results of these calculations are compared with load structure of the top that rests on the foundation. From the results of calculations that the author did, obtained pile foundation with a diameter of 0.65 m. There are 2 types of foundations consisting of 4 poles and 6 poles. And the pile cap joint type 18 uses the upper reinforcement D19-200 for the x and y directions and the lower reinforcement D19-200 for the x and y directions, the pile cap joint type 48 uses the upper reinforcement D19-125 for the x and y directions and the lower reinforcement D19- 125 for the x and y directions. All types of foundation meet the criteria of safe carrying capacity of the permit, safe against decline and safe against shifting. Keywords: carrying capacity, pile, preparation, foundation, pile cap.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Dr. Syahril, BSCE., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 161111037 & 161111060.pdf
(1026229 bytes)
File : BAB 1 - 161111037 & 161111060.pdf
(298074 bytes)
File : BAB 2 - 161111037 & 161111060.pdf
(505385 bytes)
File : BAB 5 - 161111037 & 161111060.pdf
(172815 bytes)