Path: Top > Tugas Akhir - D3 > Jurusan Teknik Konversi Energi > Program Studi Teknik Konversi Energi > 2013

Pembuatan Sistem Pemipaan Simulator PLTMH dan Pengujian Kerugian Tekanannya

Construction Piping System of Micro Hydro Power Plant Simulator and Testing Head Losses of It

Tugas Akhir, 002 / 2013 / TEN
Undergraduate Theses from JBPTPPOLBAN / 2017-04-18 16:16:16
Oleh : Fuji Juhairil Hamdalah - 101711013 (fujijuhairil@yahoo.com)
Dibuat : 2017-04-18, dengan 4 file

Keyword : kerugian tekanan, debit, pemipaan
Subjek : Head losses, piping, debit

PLTMH adalah sebuah pembangkit listrik berkapasitas 100 kW-satu MW dengan memanfaatkan tinggi jatuh air (head). Simulator yang dibuat memiliki head kotor sembilan meter. Setiap aliran fluida di dalam pipa akan mengalami rugi-rugi yang disebut rugi tekanan. Rugi aliran tersebut akan menurunkan tinggi tekan. Rugi tekanan ini terjadi disepanjang pipa dan sambungan pipa. Kerugian tekanan yang terjadipadapipaharus diminimalisir maksimal 15% dari head kotor simulator. Pemasangan sistem pemipaan harus dilakukan sesuai dengan standar, standar yang diambil dalam mengacu pada standar PDAM-OASEN. Tekanan yang terjadi pada aliran di dalam pipa untuk bukaan katup 100% tekanan yang terjadi 0,7bar, tekanan yang terjadi pada aliran dalam pipa untuk bukaan katup 50% tekanan yang terjadi 0,8bar dan tekanan yang terjadi pada aliran dalam pipa untuk bukaan katup 25% tekanan yang terjadi 1bar. Ketika debit 0,0008 m3/s, kerugian tekanan yang terjadi selama aliran air mengalir dalam pipa adalah 2,066 m, ketika debit 0,0004 m3/s, kerugian head yang terjadi selama aliran air mengalirdalampipaadalah 0,517m danketika debit 0,000345 m3/s kerugian tekanan yang terjadi sebesar 0,384 m, ini menunjukan semakin kecil debit, maka semakin kecil kerugian tekanan yang terjadi Kata kunci: kerugian tekanan, debit, pemipaan.

Deskripsi Alternatif :

Micro hydro power plant is a power plant with capacity 100 kW-1 MW by utilizing hydro potency. The making of micro hydro power plant simulator aims to see a simulation of PLTMH with closed flow system. The Simulator has made have head gross 9 meters, with head geodetic 10.5 m . Any fluid flow in the pipe would have a friction with the pipe or the pipe with the connection. The friction of the fluid will decrease high pressure or head losses. Head losses that occurs in a pipe should be minimized, with maximum 15 % from a gross high simulator .A system of piping in the simulator is very important. The installation of a system of piping to be done in accordance with a standard, a standard that is taken refers to standard PDAM-OASEN. The pressure that occurs in the water flow with valve opening 100%, the pressure is 0.7bar and the valve openings 50%, the pressure that occurs 0.8bar and pressure that occur on the dynamic step at the valve openings 25% the pressure is 1bar. When debt 0.0008 m3/s, head losses that occur during at dynamic step is 2.066 m, When debt 0.0004 m3/s, head losses that occur during at dynamic step is 0. 517m and when debt 0.000345 m3/s, head losses that occur by 0.384 m, suggesting that the smaller the discharge, then the smaller the pressure losses occurring Keywords: Head losses, piping, debit.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Drs. Dja'far Sodiq, S.T., M.T., Editor: Erlin Arvelina

Download...