Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2015

Perancangan Instalasi Sistem Penerangan Lapangan Olahraga Terbuka Basket Dan Voli Politeknik Negeri Bandung

Lighting System Installation Planning Of Basketball And Volleyball Outdoor Court In Politeknik Negeri Bandung

Tugas Akhir, 017 / 2015 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2018-07-17 12:47:04
Oleh : Gadisa Fitri - 121321044 (gadisa.fitri@yahoo.co.id )
Dibuat : 2018-07-17, dengan 4 file

Keyword : instalasi sistem penerangan.
Subjek : installation of lighting systems.

Lapangan olahraga terbuka basket dan voli merupakan sarana olahraga yang menggunakan penerangan pada waktu-waktu tertentu seperti pada malam hari dan pada saat langit mendung, maka dari itu diperlukan jenis lampu yang mempunyai tingkat luminasi yang merata agar kenyamaan visualisasi pengguna dan penonton dapat terpenuhi, sehingga dibutuhkan adanya instalasi sistem penerangan. Maka dalam tugas akhir ini akan dilakukan suatu pembahasan mengenai perancangan instalasi sistem penerangan pada lapangan olahraga terbuka basket dan voli Politeknik Negeri Bandung. Sehingga dengan perhitungan yang disesuaikan dengan standar akan dapat kita ambil langkah perancangan yang tepat, langkah perancangan itu sendiri terdiri dari: menentukan fluks cahaya, pemilihan jenis lampu, menentukan setting pengaman dan KHA penghantar, perhitungan susut tegangan, rekapitulasi daya, dan penyusunan bill of quantity. Kata kunci: instalasi sistem penerangan.

Deskripsi Alternatif :

Basketball and Volleyball outdoor courts are sport facilities that use lighting at certain times such as at night and on cloudy sky, therefore it needs types of lights that have a uniform luminance level in order to fulfill viewers visualization convenience, so it is necessary for the installation of lighting systems. Hence, this final project will discuss the design of the installation of lighting systems in Basketball and Volleyball outdoor courts of Politeknik Negeri Bandung. Thus the calculations are adjusted to the standard will be able to take steps proper design, the design itself comprises the steps of : determining the light flux, the selection of lightingtype, security settings and CRC determines conductor, calculation of shrinkage stress, recapitulation power, and the preparation of the bill of quantity. Keywords: installation of lighting systems.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Sudrajat, B.Eng., M.Eng.Sc.

    Pembimbing 2: Supriyanto, S.T., M.T., Editor: Erlin Arvelina

Download...