Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2017
Rancangan Turbin Uap Penggerak Pompa Air Pengisi Boiler Untuk PLTU Kapasitas 698 MW
The Design Of Steam Turbine As Primeover Boiler Feed Pump In 698 Capacity Coal Fired Power Plant
Tugas Akhir, 008 / 2017 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:20
Oleh : Gerry Gumelar Karmana - 131724009 (gerrygk13@gmail.com)
Dibuat : 2017-12-07, dengan 4 file
Keyword : PLTU, pompa, turbin uap penggerak pompa air pengisi boiler, turbin impuls
Subjek : Coal Fired Power Plant, turbine driven boiler feed pump, impulse turbine
Penggunaan daya sendiri adalah usaha yang dilakukan untuk memenuhi kebutuhan di dalam sistem dari sebuah PLTU, tentunya daya terbangkitkan harus digunakan secara selektif dan tepat guna. Pada proses pembangkitan tenaga listrik air merupakan fluida kerja utama dalam upaya menghasilkan uap, pompa air pengisi boiler bertugas dalam mengalirkan air kedalam ruang boiler, turbin uap digunakan sebagai penggerak pompa air pengisi boiler. Pada Tugas Akhir ini, dilakukan simulasi sistem PLTU dengan kapasitas 698 MW melalui perangkat lunak Gate Cycle untuk mengetahui kebutuhan pompa air pengisi boiler dan daya poros yang dibutuhkan untuk menggerakkannya. Laju alir massa air pengisi boiler sebesar 631 kg/s harus di berikan oleh pompa dengan daya poros yang dibutuhkan sebesar 24.114 kW, pemanfaatan uap ekstraksi turbin tekanan menengah pada kondisi 15 bar dengan laju alir uap ekstraksi terhadap turbin penggerak BFP sebesar 45 kg/s. Perhitungan penurunan kalor dan segitiga kecepatan dilakukkan untuk memperoleh tinggi dari sudu gerak dan sudu tetap tiap tingkatan, berdasarkan hasil rancangan diperoleh turbin BFP memiliki 6 tingkat, dengan menggunakan jenis poros rotor konstruksi solid berbahan ASTM A 470 Grade B class 4 dengan diameter sebesar 0.88 m, kemudian hasil rancangan ini disimulasikan melalui perangkat lunak Axstream Profesional III diperoleh jumlah tingkat adalah 6 dengan tinggi sudu relatif sesuai dengan perhitungan, dan daya poros sebesar 24.334 kW sedangkan secara perhitungan adalah 24.114 kW. Profil sudu secara 2 dimensi dan 3 dimensi digunakan untuk analisis perilaku termodinamika yang terjadi pada turbin uap penggerak pompa air pengisi boiler. Kata kunci: PLTU, pompa, turbin uap penggerak pompa air pengisi boiler, turbin impuls.
Deskripsi Alternatif :Unit auxiliary load is an effort to fulfil the demand of internal electricity consumption in a coal fired power plant, the generated power has to be used selecitvely and efficiently . Water is a main working fluid, in order to produce steam of the process electricity generation, boiler feed pump is driven by the steam turbine. In this final project, coal fired powerplant with 698 MW capacity, conduct by a simulation of a software Gate Cycle in order to determine boiler feed water pump shaft power and capacity. The amount work that needed to deliver mass flow of 631 kg/s by the boiler feed pump is 24.114 kW, by harnessing steam extraction from intermediate steam turbine at the pressure of 15 bar by the steam mass flow of 45 kg/s. Heat drop distribution and triangle of speed calculation is held to determine the height of fixed and moving blades in every stages, according to the result the design achieve 6 stage of the arrangement, using solid rotor construction, which means the wheel attached solidly to the shaft and the material that used are ASTM A 470 Grade B class 4 with the diameter of hub 0,88 m, then the result simulated in the turbomachinery design software called Axstream Profesional III, with the simulation the stages stay the same at 6 stages and the height of fixed and moving blades are relatifly the same, and the shaft power slightly different at 24.334 kW by the simulation and 24.114 kW by the calculation. The blade profile consist with 2 dimensional and 3 dimensional for further analysis in thermodynamics phenomenon along side the turbine driven boiler feed pump. Keywords: Coal Fired Power Plant, turbine driven boiler feed pump, impulse turbine.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Ir. Teguh Sasono, M.T.
Pembimbing 2: Drs. Maridjo, M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 131724009.pdf
(373303 bytes)
File : BAB 1 - 131724009.pdf
(149014 bytes)
File : BAB 2 - 131724009.pdf
(1353471 bytes)
File : BAB 5 - 131724009.pdf
(94100 bytes)