Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Perawatan & Perbaikan Gedung > 2021

Evaluasi Struktur Atas Berdasarkan SNI 1726:2019 dan SNI 2847:2019 pada Gedung G Rumah Sakit Mata Cicendo Bandung

Evaluation Of the Upper Structure Based on SNI 1726:2019 and SNI 2847:2019 at Building G Cicendo Eye Hospital Bandung

Skripsi, 011 / 2021 / TPPG
Undergraduate Theses from JBPTPPOLBAN / 2022-09-23 13:42:19
Oleh : Haykal Zaky Muzhaffar - 171144014 & Mitha Arya Nidyawati - 171144020 (mitha.arya.tppg17@polban.ac.id)
Dibuat : 2022-09-23, dengan 4 file

Keyword : balok, kolom, joint, perkuatan, concrete jacketing, metode kerja
Subjek : beam, column, joint, strengthening, concrete jacketing, work method

Dalam UU RI No. 28 Tahun 2002, mengatakan bahwa setiap bangunan gedung harus memenuhi asas keselamatan, sehingga memenuhi persyaratan bangunan gedung. Maka dari itu bangunan harus direncanakan dengan tepat sehingga mampu menerima beban-beban yang terjadi.Dengan beban yang bekerja terdiri dari beban mati, beban mati tambahan, beban hidup, dan beban gempa. Gedung G Rumah Sakit Mata Cicendo Bandung merupakan gedung yang akan dievaluasi. Gedung ini dibangun menggunakan struktur beton bertulang yang didirikan pada tahun 2018 dengan sistem pemikul momen khusus. Gedung tersebut mengacu pada SNI 2847:2013 dan SNI 1726:2012. Seiring dengan berjalannya waktu, SNI 2847:2013 dan SNI 1726:2012 mengalami pembaharuan, menjadi SNI 2847:2019 dan SNI 1726:2019. Dengan pembaharuan peraturan tersebut, maka perlu dilakukan evaluasi terhadap kekakuan, kestabilan dan kekuatan struktur pada gedung ini. Setelah dilakukan analisis pada gedung ini, terdapat elemen kolom dan balok yang tidak memenuhi persyaratan, maka untuk meningkatkan kapasitas pada balok dan kolom tersebut dilakukan perkuatan concrete jacketing. Kata kunci: balok, kolom, joint, perkuatan, concrete jacketing, metode kerja.

Deskripsi Alternatif :

According to UU RI No.28 (2002) every building must meet the safety-based principal to meet the required building standardization. Due to that reason, the building must be properly designed to make it durable and withstanding against every load put on it. The loads could be dead load, superimpose dead load, live load, and earthquake load. Building G of Eye Hospital Cicendo Bandung is a building that will be evaluated in this research. This building was built in 2018 using a reinforced concrete with a special moment frame. The building was designed based on SNI 2847:2013 and SNI 1726:2012 standardization. As time goes by, SNI 2847:2013 and SNI 1726:2012 have been updated to be SNI 2847:2019 and SNI 1726:2019.Due to the updated standardization, it is necessary to evaluate the strength, stability, and stiffness of this building's structures. After analyzing this building structure, the researcher found that the building has some under required elements of column and beams. To increase the capacity of column and beam, concrete jacketing strengthening is required. Keywords: beam, column, joint, strengthening, concrete jacketing, work method.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Ir. Riawan Gunadi, M.T., Editor: Erlin Arvelina

Download...