Audit Energi Power Quality dan Utilitas di Hotel Lebak Gunung Permai
Energy Audit of Power Quality and Utility in Lebak Gunung Permai Hotel
Tugas Akhir, 005 / 2012 / RTUUndergraduate Theses from JBPTPPOLBAN / 2017-04-11 10:03:22
Oleh : Jidan - 091711020 (jidanhungkul@yahoo.com)
Dibuat : 2014-07-17, dengan 4 file
Keyword : audit energi, quality, utility
Subjek : energy audit, quality, utility
Audit energi merupakan teknik yang digunakan untuk menghitung besarnya konsumsi energi pada bangunann gedung dan mengenali cara-cara penghematannya. Audit energi dilakukan di Hotel Lebak Gunung Permai dengan fokus pada power quality dan sistem utilitas yang terdiri dari heater dan pompa. Intensitas Konsumsi energi pada Hotel Lebak Gunung Permai rendah karena non AC. Profil konsumsi energi adalah sistem utilitas mengkonsumsi energi listrik sebesar 73% dengan heater 66% dan pompa 7% dan sisanya 27% untuk lain-lain yang terdiri dari stop kontak dan pencahayaan. Selain itu, power quality pada panel di Hotel Lebak Gunung Permai, mayoritas sudah cukup baik akan tetapi ada beberapa panel yang kurang baik seperti di SDP Gedung Putih dan Pink. Pada sistem utilitas terjadi pemborosan energi karena utilitas bekerja selama 24 jam. Pada pompa juga terjadi pemborosan dimana pompa terlalu sering ON OFF yang membuat umur pompa turun 50%. Untuk mengatasi hal ini, dilakukan dengan pemansangan timer untuk mengatur operasi pompa. Sehingga dapat menghemat Rp. 1.100.000,- per tahun, dengan nilai investasi yang cukup menguntungkan. Sedangakan pada heater dilakukan pemasangan timer dan tangki penampung air panas dimana didapatkan saving hingga Rp. 242.720.523,- per tahun dan investasinya sangat menguntungkan. Kata Kunci: audit energi, quality, utility
Deskripsi Alternatif :Energy audit is a technique that used to calculate the level of energy consumption at the building and to know the method how to get chance to economizing. Audit energy have done in Lebak Gunung Permai hotel with focus on power quality and utility system that consist of heater and pump. Intensity of energy consumption at Lebak Gunung Permai Hotel is low because there is non Air Conditioning. Profile energy consumption is Utility system consume 73 % of total energy consumption where heater consume 66% and pump 7% then stop contact and lighting consume 27% of total energy consumption. Beside that, power quality of panel at lebak gunung permai hotel, majority has been good. But, there are some panel is not good like SDP gedung pink and gedung putih. Energy consumption of utility system was wasteful because the utility work 24 hours. Beside that, operation of pump is not good where pump often ON and OFF in short time interval. It can make life time of pump descend 50%. So timer will be used to control operation of pump, so we can save Rp. 1.100.000,-/year with beneficial investment. But, heater will be installed timer and tank to receive hot water. so we can save Rp. 242.720.523,,-/year with exceptionally beneficial investment. Keywords: energy audit, quality, utility
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Kholiq Hernawan, Ir., MT., Editor: Erlin Arvelina
Download...
File : DAFTAR - 091711020.pdf
(334107 bytes)
File : BAB 1 - 091711020.pdf
(238011 bytes)
File : BAB 2 - 091711020.pdf
(543406 bytes)
File : BAB 5 - 091711020.pdf
(290904 bytes)