Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Akuntansi > Program Studi Akuntansi > 2019
Pengumpulan Biaya Produksi berdasarkan Job Order Costing dalam Menghitung Harga Pokok Produksi Pada CV. Barokah Mandiri
Collection of the Cost of Production based on Job Order Costing in Calculating the Cost of Goods Manufactured at CV. Barokah Mandiri
Tugas Akhir, 016 / 2019 / AKUUndergraduate Theses from JBPTPPOLBAN / 2020-03-20 08:01:24
Oleh : Lala Handayani - 165111017 (lala.handayani.lh@gmail.com)
Dibuat : 2020-03-20, dengan 4 file
Keyword : Job Order Costing, Pengumpulan Biaya Produksi, Biaya Produksi, Harga Pokok Produksi
Subjek : Job Order Costing, Collection of the Cost of Production, Production Costs, Cost of Goods Manufactured
Metode pengumpulan biaya produksi ditentukan berdasarkan cara perusahaan melakukan produksi. Terdapat dua metode pengumpulan biaya produksi yaitu metode pengumpulan biaya produksi berdasarkan pesanan apabila perusahaan melakukan produksi jika ada pesanan, dan metode pengumpulan biaya produksi berdasarkan proses apabila perusahaan melakukan proses secara terus-menerus. Tujuan penelitian ini yaitu untuk mengetahui bagaimana pengumpulan biaya produksi produksi berdasarkan job order costing untuk menghitung harga pokok produksi pada CV. Barokah Mandiri. Metode penelitian yang digunakan adalah deskriptif kuantitatif, yaitu penelitian yang menjelaskan suatu fenomena dengan menggunakan angka-angka. Dalam menyelesaikan penelitian ini, alat Analisis data yang digunakan adalah metode pengumpulan biaya produksi berdasarkan pesanan untuk membantu menghitung harga pokok produksi pada suatu pesanan. Hasil penelitian menunjukkan perhitungan harga pokok produksi perusahaan memiliki nilai lebih kecil dari biaya produksi seharusnya. Hal ini dapat dilihat perhitungan harga pokok produksi perusahaan Rp19.735.029 sedangkan pada perhitungan harga pokok produksi berdasarkan pesanan sesungguhnya Rp21.975.589. Kata Kunci: Job Order Costing, Pengumpulan Biaya Produksi, Biaya Produksi, Harga Pokok Produksi.
Deskripsi Alternatif :The method of collection of the cost of production is determined based on the way the company makes production. There are two methods of collection of the costs of production, that is the method of collecting production costs based on orders if the company did production if there is an order, and the method of collecting production costs is based on the process if the company carried out the process production continuously. The purpose of this study is to find out how to collect the cost of production based on job order costing to calculate the cost of goods manufacture on the CV. Barokah Mandiri. The research method used is descriptive quantitative, that is the research that explained a phenomenon using numbers. To completing this study, the data analysis tool used is a method of collecting production costs based on orders to help calculate the cost of goods manufactured on an order. The results of the study show that the company's calculation of the cost of goods manufactured has a value lower than the cost of goods manufactured actual. This can be seen from the calculation of the cost of goods manufactured of the company Rp19.735.029 while the recalculation of the cost of actual production is Rp21.975.589. Keywords: Job Order Costing, Collection of the Cost of Production, Production Costs, Cost of Goods Manufactured.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Neneng Dahtiah, S.E., M.Si.Ak., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 165111017.pdf
(1313179 bytes)
File : BAB 1 - 165111017.pdf
(175460 bytes)
File : BAB 2 - 165111017.pdf
(243536 bytes)
File : BAB 5 - 165111017.pdf
(169156 bytes)