RANCANG BANGUN FRONT END PROCESSOR (FEP) PADA MTU UNTUK SISTEM SCADA PLTMH BERBASIS ATMEGA128 DENGAN MEDIA KOMUNIKASI RS-485

BUILD AND IMPLEMENTATION FRONT END PROCESSOR (FEP) FOR MTU OF PLTMH SCADA SYSTEM BASED ON ATMEGA128 WITH RS-485 MEDIA COMMUNICATION

Tugas Akhir, 047 / 2012 / TLI
Undergraduate Theses from JBPTPPOLBAN / 2015-11-18 09:21:48
Oleh : Masruri - 091321022
Dibuat : 2013-05-07, dengan 4 file

Keyword : SCADA, FEP, MTU, RTU, ATMega128, RS-485, PLTMH
Subjek : SCADA, FEP, MTU, Interface, ATMega 128, RS-485, PLTMH

Semakin meningkatnya kebutuhan energi listrik untuk kegiatam masyarakat dan industri. maka, perlu dibangunya pembangkit listrik yang lebih banyak. Semakin banyaknya pembangkit, maka dibutuhkan suatu sistem kontrol secara terpusat terhadap sistem ketenagalistrikan tersebut. Hal ini bertujuan untuk menjaga keandalan suplai energi listrik secara konstan. Dengan menerapkan sistem Supervisory Control And Data Acquisition (SCADA) yang merupakan sebuah sistem pengawasan, pengendalian, dan sekaligus proses akuisisi data berkesinambungan dari sebuah Plant, dengan tingkat kompleksitas yang cukup tinggi. Maka dengan mengimplementasikan sistem ini, kinerja dari sistem pembangkit tenaga listrik lebih terkontrol. Sehingga suplai energi listrik bisa tetap terjaga keandalanya dan dapat mengurangi resiko gangguan yang mungkin terjadi. Pada proyek akhir ini dilakukan pengembangan sistem SCADA yakni merancang Front End Proccessor (FEP) yang ditempatkan pada Master Terminal Unit (MTU) berbasiskan mikrokontroler ATMega128. Alat ini dirancang untuk simulator PLTMH yang berfungsi untuk mengatur jalanya proses komunikasi data dari FEP ke MTU dan dari FEP ke Remote Terminal Unit (RTU). Komunikasi antara FEP dengan RTU dan FEP dengan RTU masing-masing melalui serial standar TTL yang dilengkapi serial to USB converter dan RS-485. Data yang diterima dan dikirim berupa besaran listrik pada generator yaitu tegangan, arus beban utama, arus dummyload, suhu, frekuensi. Pada turbin yaitu kecepatan, flow rate dan suhu turbin. Pada sinkroniser yaitu tegangan generator 1 dan generator 2 serta frekuensi generator 1 dan 2. Dari hasil pengujian yaitu diperoleh data antara lain untuk plant 1 pada generator unit 1 yaitu tegangan 222.5 V, arus beban utama setelah dibebani yaitu 0.74 A, arus dummyload 0.28 A, suhu 27.1 ?, frekuensi 50.9 Hz dan untuk plant 2 pada generator unit 2 yaitu tegangan 219.4 V, arus beban utama setelah dibebani yaitu 0.4 A, arus dummyload 0.68 A, frekuensi 52.4 Hz, suhu 28.6 ?. Kata Kunci: SCADA, FEP, MTU, RTU, ATMega128, RS-485, PLTMH

Deskripsi Alternatif :

The development of technology needs more an electrical energy to increased. Therefore, more needed an electrical power generation. After that because there are many electrical power generation, so must needed a centralized control system of the electricity system. The purpose is for to keep an electrical energy supply in order to be constant.By implementing the Supervisory Controll And Data Acquisition (SCADA) is a system of supervision, control, and data acquisition process from a plant and with high complexity level. So with implementing this system,the performance of the power system will be more controlled. After that electric energy supplies could stay awake and quality will can reduce the risk of disorders that may occur.Therefore, in this final project the author conducted research on SCADA systems, which is designing the Front End Processor (FEP), that is placed in a Master Terminal Unit (MTU) based on microcontroller ATMega128 and with a Recommended Standard 485 media communication. The FEP is design to implementation in micro hydro electrical power station simulator that serve to regulate their nets prcesses of data communication from FEP to MTU and from FEP to Remote Terminal Unit (RTU). The data are received and transmited in the unit of electrical quantities in generator unit1 and 2, consist of voltage, current of the main load, current of dummyload, frequency, and temperature. In the turbine are consist of speed, flow rate, and turbine temperature. In a synchronize are consist of voltage and frequency of generator unit 1 and unit 2.


The result of test got a final conclusion is consist of for plant 1 in generator unit 1 there are voltage 222.5V, current of the main load 0.74A after loaded, current of dummyload 0.28A, frequency 50.9Hz, and temperature 27.1℃. For plant 2 in generator unit 2 there are voltage 219.4V, current of the main load 0.4 A after loaded, current of dummyload 0.68A, frequency 52.4Hz, and temperature 28.6℃.


Keyword: SCADA, FEP, MTU, Interface, ATMega 128, RS-485, PLTMH

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Yusuf Sofyan, ST., MT.


    Pembimbing 2: Teddi Hariyanto, ST., MT. , Editor: Erlin Arvelina

Download...