Path: Top > Tugas Akhir - D3 > Jurusan Teknik Elektro > Program Studi Teknik Listrik > 2015
Simulasi Pengujian Gangguan Simpatetik Trip Pada Penyulang Saluran Kabel Bawah Tanah
Symphatetic Trip Disruption Testing Simulation In Underground Feeder Cable Channel
Tugas Akhir, 022 / 2015 / TLIUndergraduate Theses from JBPTPPOLBAN / 2018-07-17 12:28:55
Oleh : Moh. Alif Abdul Latif - 121321018 (muhammad.alifabd@gmail.com )
Dibuat : 2018-07-17, dengan 4 file
Keyword : pengujian, gangguan simpatetik trip, gangguan hubung singkat 1 fasa ke tanah, relai gangguan tanah, relai waktu kerja tertentu.
Subjek : testing, sympathetic trip disruption, short circuit 1 phase to ground, ground fault relay, definite time relay.
Sistem proteksi digunakan sebagai pengaman untuk mengantisipasi sistem apabila terjadi gangguan, selain itu proteksi juga diperlukan untuk memisahkan bagian yang terkena gangguan dengan yang tidak sehingga sistem dapat tetap menjalankan operasinya. Apabila peralatan proteksi pada sistem memberikan respon yang salah terhadap gangguan yang terjadi, maka akan terjadi simpatetik trip. Simpatetik trip ini merupakan peristiwa yang menggambarkan kejadian sewaktu peralatan proteksi merespon secara tidak diharapkan atau salah pada saat sistem tenaga dalam keadaan gangguan. Pada tugas akhir ini akan dibuat sebuah simulasi percobaan gangguan simpatetik trip yang disimulasikan dengan sebuah jaringan yang terdiri dari 2 buah penyulang yang pada salah satu penyulangnya dilakukan gangguan hubung singkat 1 fasa ke tanah dengan menggunakan relai gangguan tanah dengan karakteristik definite time relay pada kedua penyulang, tujuannya adalah untuk mengetahui pengaruh dari penyulang yang terganggu terhadap penyulang lainnya (penyulang sehat)sehingga bisa terjadi gangguan simpatetik trip. Pembuatan simulasi ini diharapkan dapat memberikan pemahaman mengenai gangguan simpatetik trip yang terjadi pada saluran kabel bawah tanah. Kata Kunci : pengujian, gangguan simpatetik trip, gangguan hubung singkat 1 fasa ke tanah, relai gangguan tanah, relai waktu kerja tertentu.
Deskripsi Alternatif :Protection system used to anticipate the event of disruption, besides protection is also necessary to separate the affected area with a disruption that is not so that the system can still run operations. If the protective device on the system gives an incorrect response to the disturbance, there will be a sympathetic trip. Sympathetic trip is an event that describes the incident when the protective device responds unexpected or wrong at the time of the power system in a state of disorder. In this final project will be made a sympathetic trip disruption simulation experiment with a network that consists of 2 pieces feeder where in one of the feeders do one phase short circuit to ground and using ground fault relay with definite time characteristics of the relay of the both feeder, the goal is to determine the effect of the disturbed feeder to the other feeder (the healthy feeder)so that problems can occur a sympathetic trip. By making the simulation is expected to provide an understanding of the sympathetic trip interruption that occurs in the underground feeder cable channels. Keywords: testing, sympathetic trip disruption, short circuit 1 phase to ground, ground fault relay, definite time relay.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Supriyanto, S.T., M.T.
Pembimbing 2: Sunarto, S.T., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 121321018.pdf
(1166065 bytes)
File : BAB 1 - 121321018.pdf
(280341 bytes)
File : BAB 2 - 121321018.pdf
(976532 bytes)
File : BAB 5 - 121321018.pdf
(259377 bytes)