Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2012
Perancangan Ruas JL. Jendral Ahmad Yani Dalam Meningkatkan Tingkat Pelayanan Jalan Segmen Simpang JL. Jakarta-Simpang Cicaheum, Kota Bandung
Designing Of Jendral Ahmad Yani Road For Increasing Level Of Service Segment Jakarta Road Intersection-Cicaheum Intersection, Bandung City
Tugas Akhir, 007 / 2012 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:05:49
Oleh : Muhamad Dalil Haidar - 08124019
Dibuat : 2013-01-08, dengan 4 file
Keyword : Perancangan Kawasan Cicadas, Perancangan Jalan, Gateway Apartement, Kapasitas Jalan
Subjek : Designing Cicadas Area, Road Designing, Gateway Apartement, Road Capacity
Jalan Jend. Ahmad Yani pada lokasi kajian I (3/1 UD) memiliki tingkat pelayanan jalan E dengan nilai VCR 0,89 dan pada lokasi kajian II (2/2 UD) adalah C dengan nilai VCR 0,69. Sedangkan kecepatan rata-rata pada lokasi kajian adalah kurang dari 30 Km/Jam. Dengan demikian dapat diketahui bahwa kondisi dari Jalan Jend. Ahmad Yani perlu mendapat penangan lebih lanjut untuk mengembalikan tingkat pelayanan jalan yang baik. Tingginya volume kendaraan yang masuk pada lokasi kajian tidak diimbangi dengan kapasitas jalan yang memadai, kapasitas jalan pada lokasi kajian sendiri cenderung semakin berkurang akibat banyaknya aktivitas hambatan samping. Perancangan Jalan Jend. Ahmad Yani dilakukan dengan merubah geometrik jalan (pelebaran) dan menambahkan fasilitas-fasilitas pendukung jalan. Perancangan direncanakan bertahan sampai tahun 2014 dengan predikasi pertambahan arus lalu lintas tahunan menggunakan metode forecasting dan kemungkinan bangkitan dan tarikan dari Gateway Apartement dengan sofware KAJI. Setelah dilakukan perancangan pada lokasi kajian, maka pada tahun 2014 lebar badan jalan berubah dari 12,8-28,5 m dan 14,6-23,5 m adapun VCR di jalan satu arah (6/1 D) adalah berkurang menjadi 0,703 dan 0,741 pada jalan dua arah (6/2 D). Kata Kunci : Perancangan Kawasan Cicadas, Perancangan Jalan, Gateway Apartement, Kapasitas Jalan.
Deskripsi Alternatif :Jend. Ahmad Yani road at first location (3/1 UD) have level of service E where VCR point is 0,89 and at second location (2/2 UD) is C where VCR pint is 0,69. While speed average at study location less from 30 Km/hours. There is Jend. Ahmad Yani road condition need improvement to return level of service in good condition. High traffic volume at study location not support with road capacity, where road capacity at study location inclined less as result of high road side friction. Designing Jend. Ahmad Yani road do with changing road geometric (widening) and build road facility support. Road designing plan can hold untill 2014 with prediction of annual traffic growth use forecasting method and the possibility of attraction and generation from Gateway Apartement with KAJI sofware. After designing at study location, in 2014 road width changing from 12,8 to 28,5 m and 14,6 to 23,5 m while VCR at one way road (6/1 D) less to 0,703 and 0,741 at two way road (6/2 D). Key Words : Designing Cicadas Area, Road Designing, Gateway Apartement, Road Capacity.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Asep Sundara, BSCE., MT. , Editor: Erlin Arvelina
Download...
File : DAFTAR - 08124019.pdf
(560760 bytes)
File : BAB 1 - 08124019.pdf
(393313 bytes)
File : BAB 2 - 08124019.pdf
(349221 bytes)
File : BAB 6 - 08124019.pdf
(315997 bytes)