Perancangan Metode Pelaksanaan Konstruksi Bangunan Rumah Tinggal Pracetak
Construction Method Design of Precast Concrete House
Tugas Akhir, 030 / 2013 / KGEUndergraduate Theses from JBPTPPOLBAN / 2017-02-20 11:17:41
Oleh : Muhamad Rizal Fauzi - 101111017 (rizalpingpong@gmail.com)
Dibuat : 2017-02-20, dengan 4 file
Keyword : Panel struktur 1, panel struktur 2, panel simpul struktur, cetakan baja, Cetakan kayu, anggaran biaya dan waktu
Subjek : panel structure 1, panel structure 2 node panel structure, steel mold, wood molding, budget and time
Dalam pelaksanaan suatu proyek bangunan rumah tinggal pracetak ada beberapa hal yang diperhatikan yaitu metode pelaksanaan, waktu dan biaya. Hal-hal tersebut dibutuhkan untuk penyelesaian rumah tinggal pracetak. Untuk menghitung rencana anggaran biaya ada tiga hal yang perlu dikerjakan yaitu penentuan Work Breakdown Structure (WBS), perhitungan volume pekerjaan dan perhitungan Analisa Harga Satuan (AHS). Adapun data-data pendukung untuk pengerjaannya yaitu spesifikasi teknis, gambar kerja, harga satuan bahan serta upah dan buku referensi bangunan rumah tinggal pracetak. Dalam tugas akhir ini, metode pelaksanaan rumah tinggal pracetak tipe 36 m2 dan 72 m2 dikhususkan pada pelaksanaan dilapangan dan perbandingan waktu biaya dari kedua tipe rumah tersebut untuk 1 unit rumah. Untuk perbandingan waktu dan biaya 1 rumah pracetak tipe 36 m2 dan 72 m2 terdapat perbedaan untuk 1 rumah tipe 36 m2 dengan harga Rp.113,114,928.85 dengan waktu pelaksanaan 23 hari sedangkan untuk tipe 72 m2 dengan harga Rp.158,179,187.90 dengan waktu pelaksanaan 25 hari. Pelaksanaan bangunan pracetak disarankan bila membangun dengan jumlah unit bangunan yang banyak disarankan menggunakan cetakan baja karena untuk mereduksi biaya pabrikasi, sedangkan untuk membangun dengan jumlah sedikit sebaiknya menggunakan cetakan kayu. Kata kunci : Panel struktur 1, panel struktur 2, panel simpul struktur, cetakan baja, Cetakan kayu, anggaran biaya dan waktu.
Deskripsi Alternatif :In the implementation of a precast residential building project, there are several things to note. They are the implementation of the method, time, and cost. Those things are required for completion of residential precast. To calculate the budget plan, there are three things that need to be done, namely the determination of Work Breakdown Structure (WBS). The calculation of the volume of work and calculation Analisa Harga Satuan(AHS). The supporting data for the process of technical specifications, working drawings, unit prices of materials and wages and reference books precast residential buildings. In this thesis, the method of implementation of residential precast type 36 m2 and 72 m2 devoted to the implementation of the real work place and the comparison of the two types of housing costs for 1 unit house. For comparison of the time and cost of 1 home precast type and 72 m2 there is a difference to type 36 m2 with price Rp.113,114,928.85 with the execution time period of 23 days, while for type 72 m2 with price Rp.158,179,187.90 with construction period of 25 days, implementation of precast buildings recommended when establishing many of building units, it is suggested using steel molds due to reduced manufacturing costs, but to build up a small amount of wood you should use a mold. Keywords : panel structure 1, panel structure 2 node panel structure, steel mold, wood molding, budget and time.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Drs. Antonius Siswanto, S.ST., M.T., Editor: Erlin Arvelina
Download...
File : DAFTAR - 101111017.pdf
(1134595 bytes)
File : BAB 1 - 101111017.pdf
(203934 bytes)
File : BAB 2 - 101111017.pdf
(260136 bytes)
File : BAB 5 - 101111017.pdf
(184617 bytes)