Metode Kerja, Penjadwalan Dan Rencana Anggaran Biaya Pekerjaan Struktur Pada Tower A Proyek Apartemen Tamansari Iswara Kota Bekasi
Work Methods, Scheduling And Budget Plan Of Structures Work At Tower A Tamansari Iswara Apartment Bekasi City
Tugas Akhir, 011 / 2019 / KGEUndergraduate Theses from JBPTPPOLBAN / 2020-04-15 21:44:18
Oleh : Muhammad Farhan Ramadhan - 161111018 & Rahmat Eka Solehudin Eka Kurniadi - 161111022 (farhanflippypart7@gmail.com)
Dibuat : 2020-04-15, dengan 4 file
Keyword : Metode kerja, Rencana anggaran biaya, penjadwalan
Subjek : working method, budget planning, scheduling
Proyek pembangunan apartemen Tamansari Iswara merupakan salah satu proyek yang ada di Kota Bekasi. Pada Proyek ini, terdapat 3 Tower. Masing-masing Tower memiliki jumlah lantai yang berbeda. Untuk Tower A memiliki lantai sebanyak 32 lantai, Tower B 34 lantai, dan Tower C 28 lantai. Selain itu, bangunan ini memiliki 2 Basement. Total unit pada apartemen ini berjumlah 1.587 unit. Pembangunan proyek apartemen ini memiliki tahapan-tahapan metode kerja yang saling bekaitan dan berurutan. Tingkat efiensi dan kualitas suatu pelaksanaan proyek dipengaruhi beberapa hal, yaitu diantaranya sumber daya manusia, alat, material serta metode kerja. Oleh sebab itu, diperlukan penyusunan metode kerja, RAB serta penjadwalan kegiatan pada proyek. Untuk menyusun metode kerja pada proyek ini khususnya Tower A adalah melakukan penyusunan WBS (Work Breakdown Structure). Berdasarkan WBS yang telah dibuat, maka kita dapat memecah dan mengelompokkan setiap kelompok pekerjaan yang dibedakan berdasarkan material, alat, sumber daya manusia serta metode kerja. Kemudian, untuk melakukan penyusunan RAB, maka tahapan awal adalah melakukan perhitungan volume masing-masing pekerjaan yang telah dipecah dan dikelompokkan tadi berdasarkan WBS. Setelah didapat volume tiap-tiap pekerjaan, maka langkah selanjutnya adalah melakukan Analisa Harga Satuan Pekerjaan (AHSP). Dalam penyusunan RAB pada proyek ini, AHSP yang digunakan mengacu pada Permen PUPR No. 28 tahun 2016 tentang Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum. Kemudian, untuk acuan harga satuan material serta harga upah tiap pekerjaan serta harga sewa alat mengacu pada buku Jurnal Daftar Harga Satuan khususnya pada wilayah Kota Bekasi. Untuk menyusun jadwal kegiatan pekerjaan proyek, maka diperlukan perhitungan durasi dan produktivitas masing-masing pekerjaan. Pada laporan ini, hasil akhir dari penyusunan jadwal kegiatan adalah berupa Kurva S serta Bar Chart. Pada proyek pembangunan apartemen Tamansari Iswara, khusus Tower A pada lantai Basement 2 hingga lantai 10, diperoleh Rencana Anggaran Biaya sebesar Rp 65.341.243.000,00 dengan total waktu pelaksanaan selama 297 hari kalender, yang dimulai pada tanggal 1 Februari 2018 hingga 24 November 2018. Kata kunci: Metode kerja, Rencana anggaran biaya, penjadwalan.
Deskripsi Alternatif :Tamansari Iswara Apartment's construction project is one of the all construction projects in Bekasi City. There is three Tower in this project. Each Tower has different floor. Tower A has 32 floors, Tower B 34 Towers, and Tower C has 28 floors. Beside that, this building has also 2 basement. Total unit of this project is 1.587 units. This Apartment's conctruction project has steps of working method that is related. Quality and efficiency of project is influenced by many aspect, like human resources, tools, equipment, material, and working method. That is why necessary to create a working method, budget planning, and scheduling. First step to create working method for Tower A is forming WBS (Work Breakdown Structure). Based on WBS, we can break and grouping any task depend on materials, equipment, tools, human resources and also working method. And then, first step on creating Budget Planning is calculate a volume of any task. And then, analysis the unit's prrice for many task (AHSP).The AHSP is referred on Permen PUPR No. 28 Tahun 2018 tentang Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum. Then, for the unit prices is referring to The Books of Daftar Harga Satuan for Bekasi City region. Later, for create a schedule, it is necessary for calculate the task's duration and productivity for any task. The final result on this report for scheduling is a Curve S and Bar chart. The final result of Tower A on basement 2 to 10th floors for Budget Planning is Rp 65.341.243.000,00 with total duration is 297 days that is started on February, 1st to November, 24th 2018. Keywords: working method, budget planning, scheduling.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Drs. Antonius Siswanto, S.ST., M.T.
Pembimbing 2: Ery Radya Juarti, S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 161111018 & 161111022.pdf
(2091289 bytes)
File : BAB 1 - 161111018 & 161111022.pdf
(616253 bytes)
File : BAB 2 - 161111018 & 161111022.pdf
(606021 bytes)
File : BAB 5 - 161111018 & 161111022.pdf
(170019 bytes)