Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2021
Studi Potensi Pembangkit Listrik Tenaga Air di Bendungan Cipanas Sumedang
Potential Study Of Hydro Power Plant In Cipanas DAM Sumedang
Skripsi, 022 / 2021 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2022-11-29 12:23:31
Oleh : Muhammad Luthfi - 171724022 (muhammad.luthfi.tptl17@polban.ac.id)
Dibuat : 2022-11-29, dengan 4 file
Keyword : Bendungan Cipanas Sumedang, Daya, Energi, Pembangkit Listrik Tenaga Air (PLTA)
Subjek : Cipanas Sumedang Dam, Power, Energy, Hydroelectric Power (PLTA)
Bendungan merupakan suatu konstruksi yang memiliki fungsi untuk menahan laju alir air. Bendungan Cipanas terletak di Desa Cibuluh, kecamatan Ujungjaya, Kabupaten Sumedang. Bendungan ini merupakan bendungan multipurpose yang memiliki ragam manfaat salah satunya untuk irigasi sebesar 9.243 Ha dan memiliki ketinggian 65 m. Bendungan ini masih dalam tahap proses pembangunan, pada tahun ini pembangunan bendungan sudah berjalan 60%. Bendungan ini dialiri oleh sungai Cipanas, dilihat dari potensinya penulis akan mencoba melakukan studi potensi dan perancangan pembangkit listrik tenaga air di Bendungan Cipanas Sumedang. Rancangan pembangkit akan disesuaikan dengan head dan debit yang akan digunakan, dilihat dari beda ketinggiannya jenis pembangkit yang digunakan adalah pembangkit listrik tenaga minihydro (PLTM). Perancangan dilakukan dengan menentukan debit andalan pembangkit pada probabilitas 65% dengan debit 6,62 m3/s. komponen inti yang digunakan pada perancangan pembangkit ini meliputi intake, pipa pesat, turbin, generator, dan trafo. Dari hasil perhitungan, pembangkit listrik yang dirancang memiliki kapasitas 2 x 1,8 MW atau sebesar 3,6 MW dan energi produksi sebesar 28309,7 MWH Kata Kunci: Bendungan Cipanas Sumedang, Daya, Energi, Pembangkit Listrik Tenaga Air (PLTA).
Deskripsi Alternatif :The dam is a construction that has a function to restrain the flow of water. Cipanas Dam is located in Cibuluh Village, Ujungjaya District, Sumedang Regency. This dam is a multipurpose dam that has various benefits, one of which is for irrigation of 9.243 Ha and has a height of 65 m. The dam is still under construction, this year 60% of the dam construction has been running. This dam is fed by the Cipanas river, judging from its potential the author will try to study the potential and designing of hydroelectric power in the Cipanas Sumedang Dam. The design of the plant will be adjusted to the head and discharge to be used, judging from the height difference, the type of power plant used is a power plant minihydro (PLTM). The design is carried out by determining the mainstay discharge of the generator at a probability of 65% with a discharge of 6.62 m3/s. The core components used in the design of this plant include intakes, rapid pipes, turbines, generators, and transformers. From the calculation results, the designed power plant has a capacity of 2 x 1,8 MW or 3,54 MW and production energi is 28309,7 MWH Keywords: Cipanas Sumedang Dam, Power, Energy, Hydroelectric Power (PLTA).
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Drs. Djafar Sodiq, S.T., M.T.
Pembimbing 2: Ir. Sri Paryanto Mursid, M.Sc., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 171724022.pdf
(1853070 bytes)
File : BAB 1 - 171724022.pdf
(522996 bytes)
File : BAB 2 - 171724022.pdf
(652988 bytes)
File : BAB 5 - 171724022.pdf
(416667 bytes)