Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2021
Perancangan Alat Pengangkut Sampah Secara Mekanikal pada PLTM Kalapa Nunggal Kabupaten Cianjur, Jawa Barat
Design of Mechanical Trash Rack at Kalapa Nunggal Mini Hydro Power Plant in Cianjur Regency, West Java
Skripsi, 023 / 2021 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2022-11-29 12:44:33
Oleh : Muhammad Raihan Marcegiani - 171724023 (muhammad.raihan.tptl17@polban.ac.id)
Dibuat : 2022-11-29, dengan 4 file
Keyword : Pembangkit Listrik Tenaga Mini hidro (PLTM), Headpond, Penyaring Sampah, Mechanical Trash rack, Motor Listrik Tiga Fasa, Gear, Sisir Pengangkut, Screen Bar, Supporting Beam
Subjek : Mini hydro Power Plant (PLTM), Headpond, Garbage Filter, Mechanical Trash rack, 3-phase Electric Motor, Gear, Carrier Comb, Screen Bar, Supporting Beam
Alat pengangkut sampah secara mekanikal (mechanical trash rack) dirancang untuk mengatasi permasalahan sampah yang terdapat di PLTM Kalapa Nunggal terutama ketika musim hujan. Mechanical trash rack direncanakan dibangun pada headpond PLTM Kalapa Nunggal. Parameter nilai yang dibutuhkan pada perancangan antara lain parameter perhitungan pada gear yang dipakai, parameter perhitungan pada motor listrik yang dipakai, head loss pada mechanical trash rack, parameter perhitungan pada screen bar di sisir pengangkut yang dipakai dan parameter perhitungan pada suporting beam yang dipakai. Dengan estimasi waktu pengangkutan tercepat sisir pengangkut sebesar 4,156 detik, massa beban maksimum yang dapat diangkut sebesar 266 kg. Analisis dilakukan dengan estimasi waktu pengangkutan selama 4,156 detik sampai 15 detik. Estimasi waktu pengangkutan akan lebih cepat apabila kecepatan putaran poros yang digunakan semakin besar. Selain itu, beban maksimum pengangkutan pada sisir pengangkut semakin besar apabila torsi yang digunakan semakin besar. Dengan estimasi waktu paling lama selama 15 detik, massa beban maksimum yang dapat diangkut sebesar 961,1 kg. Estimasi waktu pengangkutan sisir pengangkut secara continue dipilih selama 15 detik, agar motor listrik dapat memiliki masa pakai yang lama dan pengangkutan yang dilakukan oleh mechanical trash rack dapat berjalan dengan lancar. Perhitungan nilai head loss disesuaikan dengan bentuk screen bar yang digunakan, nilai head loss didapatkan sebesar 113 mm. Perhitungan pada screen bar dan supporting beam disesuaikan dengan tipe dan desain yang dipilih. Nilai bending stress pada screen bar didapatkan sebesar 116,7 kg/cm2. Nilai bending stress pada supporting beam yang didapat sebesar 1110,75 kg/cm2 dan nilai defleksi pada supporting beam sebesar 0,738 cm. Desain serta dimensi dari mechanical trash rack yang telah diperhitungkan, divisualisasikan secara 2 dimensi menggunakan software Auto CAD. Untuk visualisasi secara 3 dimensi pada rancangan mechanical trash rack dilakukan menggunakan software Solidwork. Kata Kunci: Pembangkit Listrik Tenaga Mini hidro (PLTM), Headpond, Penyaring Sampah, Mechanical Trash rack, Motor Listrik Tiga Fasa, Gear, Sisir Pengangkut, Screen Bar, Supporting Beam.
Deskripsi Alternatif :Mechanical trash rack is designed to overcome the waste problems found in the Kalapa Nunggal PLTM, especially during the rainy season. Mechanical trash rack is planned to be built on the headpond of the Kalapa Nunggal PLTM. Parameter values needed in the design include other parameters on the gear used, parameters on the electric motor used, head loss on the mechanical trash rack, parameters on the screen bar on the carrier comb used and parameters on the supporting beam used. With the estimated fastest transport time of the carrier comb of 4,156 seconds, the maximum load that can be transported is 266 kg. The analysis was carried out with an estimated transportation time of 4,156 seconds to 15 seconds. The estimated transportation time will be faster if the rotational speed of the shaft used is greater. In addition, the maximum transport load on the carrier comb is greater when the torque used is greater. With the longest estimated time of 15 seconds, the maximum load that can be transported is 961,1 kg. The estimated transportation time for the carrier comb is continuously selected for 15 seconds, so that the electric motor can have a long lifetime and the transportation carried out by the mechanical trash rack can run smoothly. The calculation of the head loss value is adjusted to the shape of the screen bar used, the head loss value is 113 mm. Calculations on the screen bar and supporting beam are adjusted to the type and design selected. The value of bending stress on the screen bar is 116,7 kg/cm2. The bending stress value on the supporting beam is 1110,75 kg/cm2 and the deflection value on the supporting beam is 0,738 cm. The calculated design and dimensions of the mechanical trash rack are visualized in 2 dimensions using Auto CAD software. For 3-dimensional visualization of the mechanical trash rack design, this is done using Solidwork software. Keywords: Mini hydro Power Plant (PLTM), Headpond, Garbage Filter, Mechanical Trash rack, 3-phase Electric Motor, Gear, Carrier Comb, Screen Bar, Supporting Beam.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Drs. Djafar Sodiq, S.T., M.T.
Pembimbing 2: Rusmana, S.ST., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 171724023.pdf
(436989 bytes)
File : BAB 1 - 171724023.pdf
(63909 bytes)
File : BAB 2 - 171724023.pdf
(755978 bytes)
File : BAB 5 - 171724023.pdf
(52482 bytes)