Perancangan Water Circulating Pump pada Boiler untuk PLTU Kapasitas 400 MW

The Design of Water Circulating Pump in Boiler for Steam Power Plant Capacity 400 MW

Skripsi, 024 / 2021 / TPTL
Undergraduate Theses from JBPTPPOLBAN / 2022-11-29 12:47:41
Oleh : Muhammad Syukur Faisal - 171724024 (muhammad.syukur.tptl17@polban.ac.id)
Dibuat : 2022-11-29, dengan 4 file

Keyword : PLTU, boiler sirkulasi paksa, NPSH, titik operasi pompa
Subjek : PLTU, forced circulation boiler, NPSH, pump operation point

Pembangkit Listrik Tenaga Uap berkapasitas 400 MW merupakan mesin pembangkit termal yang memiliki boiler sebagai komponen utamanya. Boiler model subcritical memerlukan steam drum dalam pemisahan fasa uap dan fasa cair. Proses sirkulasi secara paksa membutuhkan bantuan Water Circulating Pump yang berfungsi untuk mensirkulasikan fasa cair hasil pemisahan dari steam drum ke riser sehingga proses terjadinya uap akan lebih cepat dan terjaga serta proses pemutaran turbin akan lebih cepat dan kapasitas pembangkit tenaga listrik 400 MW dapat terpenuhi. Perancangan diawali dengan menginput parameter awal perancangan pompa hasil simulasi software gate cycle pada PLTU kapasitas 400 MW. Data yang diinput berupa tekanan pada sisi suction sebesar 171,297 bar dan pada sisi discharge sebesar 188,426 bar, suhu pada sisi suction sebesar 352,91⁰C dan pada sisi discharge sebesar 354,97⁰C, laju alir massa pada sisi suction sebesar 1965,54 kg/s dan pada sisi discharge sebesar 1965,54 kg/s. Data parameter awal digunakan untuk menentukan head total dan NPSHrequest agar tidak lebih besar dari NPSHavailable. Besarnya masing-masing parameter tersebut 51,51 m < 59,45 m, selanjutnya merancang komponen inti pompa yaitu impeller, casing dan shaft dimana bahan yang dipilih untuk komponen tersebut disesuaikan dengan standarisasi penggunaan. Berdasarkan hasil perancangan dan analisis Water Circulating Pump yang dilakukan, dapat diketahui bahwa titik operasi maksimum pompa berada pada laju alir volume 1,976 m3/s dengan head 193,13 m dan efisiensi sebesar 87% dengan besar daya hidrolis 3724,33 kW dan titik operasi minimum pompa berada pada laju alir volume 1,383 m3/s dengan head 244,15 m dan besar efisiensi 76,99% dengan besar daya hidrolis 3295,70 kW. Kata kunci: PLTU, boiler sirkulasi paksa, NPSH, titik operasi pompa.

Deskripsi Alternatif :

The Steam Power Plant with a capacity of 400 MW is a thermal generator that has a boiler as its main component. The subcritical boiler model requires a steam drum in the separation of the steam and liquid phases. The forced circulation process requires the help of a Water Circulation Pump which functions to circulate the liquid phase of the separation from the steam drum to the riser so that the steam process will be faster and maintained and the turbine rotation process will be faster and the power generation capacity of 400 MW can be fulfilled. The design begins with inputting the initial parameters of the pump design results from the gate cycle software simulation at a PLTU with a capacity of 400 MW. The data inputted is the pressure on the suction side of 171.297 bar and on the discharge side of 188,426 bar, the temperature on the suction side is 352.91⁰C and on the discharge side is 354.97⁰C, the mass flow rate on the suction side is 1965.54 kg/s and on the discharge side of 1965,54 kg/s. The initial data parameters are used to determine the total head and NPSHrequest so that it is not greater than the available NPSH. The magnitude of each parameter is 51.51 m < 59.45 m, then design the core components of the pump, namely the impeller, casing and shaft where the material selected for these components is adjusted to the standardization of use. Results based on the design and analysis of the Water Circulating Pump, it can be seen that the maximum operating point of the pump is at a volume flow rate of 1,976 m3/s with a head of 193.13 m and an efficiency of 87% with a hydraulic power of 3724.33 kW and a minimum operating point of the pump. is at a volume flow rate of 1.383 m3/s with a head of 244.15 m and an efficiency of 76.99% with a hydraulic power of 3295.70 kW. Keywords: PLTU, forced circulation boiler, NPSH, pump operation point.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Rusmana, S.ST., M.Eng.

    Pembimbing 2: Drs. Maridjo, M.T., Editor: Erlin Arvelina

Download...