Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknik Konservasi Energi > 2021

Perancangan Sistem Distribusi Air Bersih RW 27 Dengan Pembagian Beban Pengaliran Pompa Di Area Pelayanan PT Intra Cipta Mandiri

Design of RW 27 Clean Water Distribution System With Pump Distribution Load In PT Intra Cipta Mandiri Service Area

Skripsi, 019 / 2021 / TKE
Undergraduate Theses from JBPTPPOLBAN / 2022-12-28 13:34:12
Oleh : Nigel Gerald Abiyyu Triwahyono - 177134022 (nigel.gerald.tken417@polban.ac.id)
Dibuat : 2022-12-28, dengan 4 file

Keyword : distribusi air bersih, hidrolika, intensitas energi, ekonomi
Subjek : water distribution, hydraulic, energy intensity, economy

PT Intra Cipta Mandiri adalah perusahaan pengelolah distribusi air bersih untuk warga komplek Perum Pondok Padalarang Indah yang belokasi di desa Padalarang dengan total beban 679 SR . Dalam proses distribusi air bersihnya, sistem pengaliran air bersih yang dimiliki PT Intra Cipta Mandiri sudah kurang layak digunakan, ditandai dengan volume air bersih yang didistibusikan ke pengguna rata–rata perharinya 0,4 m3 terutama untuk pengaliran di RW 27 dimana untuk saluran distribusi terdapat kebocoran sebesar 27,35%. Maka dari itu diperlukan perbaikan supply dan saluran distribusi di RW 27 agar kebutuhan air bersih dapat terpenuhi. Dari hasil perancangan, untuk memenuhi kebutuhan air berdasarkan standar SNI 03-7065-2005 (120 liter/hari/orang), debit kebutuhan air untuk 10 tahun mendatang adalah 414 m3/hari untuk RW 27 dan 177 m3/hari untuk RW 28. Penambahan tandon dengan kapasitas 182,16 m3 untuk zona 1 dan 207 m3 untuk zona 2, serta penambahan pompa untuk perbaikan supply air bersih dengan spesifikasi desain Qmax = 41 m3/h, dan headmax = 67,5 meter dilakukan agar pemenuhan kebutuhan air dapat terpenuhi sesuai dengan standar. Dengan kondisi tersebut, hasil running simulasi WaterCAD, menunjukan rancangan pipa sudah memenuhi persyaratan PPDPU 2007 dari aspek hidrolika. Dan dari kelayakan ekonomi, proyek tersebut memiliki nilai investasi sebesar Rp.453.385.990,51 dengan NPV = Rp 1.913.933.934,76, dan memiliki payback periode selama 2,75 tahun, sehingga proyek tersebut layak untuk diterapkan. Intensitas energi net pada rancangan distribusi air bersih dengan pola pembagian pengaliran pompa dapat berkurang dari 1,79 kWh/m3menjadi 0,82 kWh/m3. Kata kunci: distribusi air bersih, hidrolika, intensitas energi, ekonomi.

Deskripsi Alternatif :

PT Intra Cipta Mandiri is a company that manages clean water distribution for residents of the Perum Pondok Padalarang Indah located in Padalarang village with a total load of 679 SR. In the process of distributing clean water, the clean water drainage system owned by PT Intra Cipta Mandiri is not suitable for use. It is indicated by the volume of clean water distributed to users on average is 0.4 m3 per day, especially for drainage in RW 27 where for distribution channels there are leaks. by 27.35%. Therefore, it is necessary to improve supply and distribution channels in RW 27 so that clean water needs can be met. From the results, to meet the water demand based on the SNI standard 03-7065-2005 (120 liters/day/person), the water demand discharge for the next 10 years is 300 m3/day for RW 27 and 177 m3/day for RW 28. Addition reservoirs with a capacity of 182,16 m3 for zone 1 and 207 m3 for zone 2 as well as the addition of pumps to improve the supply of clean water with design specifications Qmax = 41 m3/h, and headmax = 67,5 m are carried out so that the fulfillment of water needs can be met according to standards. Under these conditions, the results of running the WaterCAD simulation show that the pipe design has met the requirements of PPDPU 2007 from the hydraulic aspect. And from economy feasibility, this project has an investment value of IDR 453.385.990,51with an NPV value of IDR 1.913.833.934,76 and has a payback period of 2,75 years, so the project is feasible to implement. The net energy intensity in the clean water distribution design with a pump flow distribution pattern can be reduced from 1,79 kWh/m3 to 0,82 kWh/m3. Keywords: water distribution, hydraulic, energy intensity, economy.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Yanti Suprianti, S.T., M.T.

    Pembimbing 2: Dr. Ir. Sapto Prajogo, M.Si., Editor: Erlin Arvelina

Download...