Audit Energi Pada Bangunan Gedung Perkantoran PT Inti Bandung: Sistem Transportasi Gedung (Lift)

Energy Audit At PT Inti Bandung Office Building: Elevator System

Tugas Akhir, 049 / 2014 / TEN
Undergraduate Theses from JBPTPPOLBAN / 2018-04-20 11:20:25
Oleh : Nilam Mustikaning Nagari - 111711018 (nilamn16@gmail.com)
Dibuat : 2018-04-20, dengan 4 file

Keyword : Audit energi, Lift, Motor induksi, Penghematan energi
Subjek : Energy audit, Elevator, Induction motor, Energy saving

Keberadaan lift sebagai salah satu sarana transportasi gedung merupakan suatu kebutuhan yang penting terutama untuk bangunan yang memiliki jumlah lantai yang cukup banyak seperti di gedung perkantoran GKP (Gedung Kantor Pusat) PT INTI yang memiliki jumlah lantai 10 dan jumlah karyawan yang tidak sedikit. Kegiatan audit energi dilakukan untuk mengantisipasi langkah penghematan energi dan penambahan kualiatas performansi sistem lift. Dilakukan kegiatan audit berupa pengukuran energi listrik yang digunakan dan harmonisa di panel listrik lift. Pengukuran dilakukan khusus pada panel listrik lift penumpang (lift 2) dan lift service (lift 5). Didapat karakteristik penggunaan daya lift 2 dan lift 5 saat keadaan turun cenderung lebih besar dibandingkan saat keadaan naik. Karena adanya VSD pada control panel lift maka menimbulkan harmonisa arus pada lift 2 dan lift 5 mencapai 100% tetapi karena harmonisa tegangan sistem lift rendah yaitu 2,5% maka harmonisa dari panel lift tidak berbahaya. Efisiensi mekanik motor lift 2 sebesar 89,87% dan lift 5 sebesar 89,71%. Walaupun dibawah dari standarnya (91%) tetapi masih termasuk baik karena usia motor sudah lebih dari 20 tahun, maka hanya dibutuhkan kegiatan maintenance motor induksi. Rekomendasi manajemen energi yang sebaiknya dilakukan yaitu mematikan satu lift penumpang dengan energy saving sebesar 667,7kWh/bulan dan cost saving sebesar Rp.881.407/bulan. Kemudian kegiatan mematikan tiga lift penumpang dari jam 20.00-06.00 dengan energy saving sebesar 270kWh/bulan dan cost saving sebesar Rp.356.400/bulan. Maintenance komponen sistem lift perlu dilakukan untuk mengurangi guncangan di kereta lift. Kata kunci: Audit energi, Lift, Motor induksi, Penghematan energi.

Deskripsi Alternatif :

The existence of elevator as a high-building transportation is important especially for a building that have floor amount that quite a lot like GKP (Gedung Kantor Pusat) PT INTI wich have 10 floors and have amount of employees quite a lot. Energy audit is conducted to anticipate on energy saving and to increase the quality and performance of elevator system. Electrical energy and harmonics for elevator traction motor is be measured. Measurement is done at electrical panel source for passanger elevator (elevator 2) and service elevator (elevator 5). The result is the characteristic of elevator used power when elevator 2 and elevator 5 goes down is more bigger than when elevator goes up. Because of VSD on elevator control panel so it emerged a big current harmonics until more than 100% but the voltage harmonics is only 2,5% so harmonics form elevator system is not dangerous. Mechanical efficiency of elevator motor number 2 is 89,87% and elevator motor number 5 is 89,71%. Although the efficiency is below the standard (91%) because of the age is more than 20 years it is still on good range, so the induction motor only need to be maintenance. Energy management that recommended to do are turn off one of elevator passenger which have energy saving 667,7kWh/month dan cost saving Rp.881.407/month. Then turn off 3 passenger elevator form 20.00-06.00 which have energy saving 270kWh/month dan cost saving Rp.356.400/month. Maintenance the component of elevator system is needed for reduce the shaking on elevator car. Keywords: Energy audit, Elevator, Induction motor, Energy saving.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Drs. Ali Mashar, M.Eng.Sc., Editor: Erlin Arvelina

Download...