Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019

Perancangan Ulang Struktur Bagian Bawah Gedung East Jakarta Japanese School

Redesign The Bottom Structure Of East Jakarta Japanese School Building

Tugas Akhir, 013 / 2019 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2020-04-16 14:59:35
Oleh : Novita Sari - 161111050 & Vivi Andriani - 161111061 (novinovita012@gmail.com)
Dibuat : 2020-04-16, dengan 4 file

Keyword : bored pile, daya dukung, pile cap, penulangan, titik
Subjek : bored pile, carrying capacity, pile cap, reinforcement, point

Pada pengerjaan tugas akhir ini, proyek yang ditinjau adalah proyek pembangunan gedung East Jakarta Japanese School yang berlokasi di Kawasan Industri Cikarang. Bangunan ini terdiri dari dua lantai dengan total luas 7.354,65 m2. Perencanaan pekerjaan fondasi pada proyek ini menggunakan fondasi tiang pancang, namun terjadi kesalahan yaitu tiang pancang patah pada titik A9, A10, B10, dan C10. Oleh karena itu, dilakukan perencanaan ulang dengan mengganti jenis fondasi dari tiang pancang menjadi bored pile. Untuk mendapatkan data beban yang bekerja pada struktur atas, kami melakukan pemodelan menggunakan aplikasi ETABS 2016. Perencanaan fondasi proyek ini dilakukan dengan menghitung daya dukung berdasarkan hasil penyelidikan tanah Standard Penetration Test (SPT). Perhitungan daya dukung aksial dilakukan dengan metode Mayerhof dan Terzaghi & Peck, perhitungan daya dukung lateral menggunakan metode Broms, perhitungan efisiensi grup tiang menggunakan metode semi-empiris, perhitungan tebal pile cap berdasarkan SNI 03-2847-2013, perhitungan penulangan bored pile menggunakan metode yang sama dengan penulangan kolom beton, dan perhitungan penulangan pile cap menggunakan metode yang sama dengan penulangan pada pelat beton. Dari perhitungan yang dilakukan, didapatkan desain bored pile dengan diameter 30 cm, tulangan utama 7D22 dan tulangan sengkang spiral D13-100 pada kedalaman 10 m. Jumlah bored pile dalam satu grup tiang pada titik A9 berjumlah 2 buah, sedangkan pada titik A10, B10, dan C10 berjumlah 4 buah. Dimensi pile cap pada titik A9 adalah 900 x 1850 mm, sedangkan dimensi pile cap pada titik A10, B10, dan C10 adalah 1850 x 1850 mm. Tulangan atas dan bawah pile cap pada titik A9 untuk arak x adalah 7D19-100 dan arah y 15D19-100, sedangkan tulangan atas dan bawah pada titik A10, B10, dan C10 untuk arah x adalah 15D19-100, dan untuk arah y 15D19-100. Kata Kunci: bored pile, daya dukung, pile cap, penulangan, titik.

Deskripsi Alternatif :

During this final project, the project under review is the East Jakarta Japanese School building project which located in the Cikarang Industrial Estate. This building consists of two floors with total area 7,354.65 m2. The foundation planning on this project used pile foundations, but there was a problem that the piles was broken at points A9, A10, B10, and C10. Therefore, re-planning is carried out by replacing the type of foundation from the pile to bored pile. To obtain load data that works on the upper structure, we were using the ETABS 2016 software for modeling. The foundation planning of this project is performed by calculating the carrying capacity based on the results of a soil investigation Standard Penetration Test (SPT). The calculation of axial carrying capacity was carried out by the Mayerhof and Terzaghi & Peck methods, the calculation of lateral carrying capacity using the Broms methods, the calculation of pole group efficiency using semi-empirical methods, the calculation of thick pile cap based on SNI 03-2847-2013, the calculation of bored pile reinforcement uses the same method as reinforcement of concrete columns, and the calculation of pile cap reinforcement uses the same method as reinforcement on concrete plates. From the calculations, the design of bored pile with a diameter of 30 cm was obtained, the main reinforcement was 7D22 and spiral stirrup reinforcement was D13-100 at a depth of 10 m. The number of bored piles in one pole group at point 97 was 2 piles, while for point 109, 110 and 111 there were 4 piles. The dimension of the pile cap on point 97 are 900 x 1850 mm, while the dimension of the pile cap on points 109, 110 and 111 are 1850 x 1850 mm. Top and buttom reinforcement of the pile cap at point 97 for the axis x is 7D19-100 and the axis y 15D19-100, while top and buttom reinforcement the points 109, 110, and 111 for the axis x are 15D19-100, and for the axis y15D19-100. Keywords: bored pile, carrying capacity, pile cap, reinforcement, point.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Syahril, BSCE., M.T., Editor: Erlin Arvelina

Download...