Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2021
Evaluasi Fondasi Bored Pile Terhadap Perbedaan Kedalaman dan Kontribusi Beban Ground Water Tank pada Proyek Pembangunan Gedung Fakultas Farmasi UNJANI
Evaluation of Bored Pile Foundation on Differences of Depth and Contribution Ground Water Tank Load at The Faculty of Pharmacy UNJANI Building Project
Tugas Akhir, 028 / 2021 / KGEUndergraduate Theses from JBPTPPOLBAN / 2022-09-05 09:52:17
Oleh : Ovi Khofifah Fajriyah - 181111056 & Wafin Afifah Taghsya - 181111062 (ovi.khofifah.tkgd18@polban.ac.id )
Dibuat : 2022-09-05, dengan 4 file
Keyword : Bored pile, retaining wall, ground water tank.
Subjek : Bored pile, struktur dinding penahan tanah tanah, ground water tank.
Pada setiap bangunan tentunya memerlukan struktur yang dapat menopang seluruh beban bangunan. Struktur tersebut ialah fondasi yang akan menyalurkan beban ke tanah keras yang berada di bawahnya. Pada Proyek Pembangunan Gedung Fakultas Farmas ini, digunakan fondasi bored pile dengan kedalaman 12 m. Namun, hasil dari pengujian SPT diketahui pada kedalaman 6 m pun sudah termasuk tanah keras. Maka penulis melakukan evaluasi dengan merencanakan fondasi bored pile pada as 9-B dengan kedalaman 10 m dan as 6-A serta 5-A dengan kedalaman 8 m. Setelah dilakukan perhitungan dihasilkan fondasi bored pile 6D900 untuk as 9-B dan 6-A dan 4D1000 untuk as 5-A. Pada pekerjaan struktur bawah bangunan gedung Fakultas Farmasi UNJANI terdapat pula pekerjaan penampungan air bawah tanah (Ground Water Tank) yang terdiri atas struktur dinding penahan tanah. Akibat adanya pekerjaan tersebut maka area fondasi di bawah GWT akan menerima beban yang lebih berat dibandingkan dengan area fondasi yang tidak terkena GWT. Maka dari itu dilakukan juga perencanaan struktur dinding penahan tanah dengan melakukan analisis terhadap desain DPT sebelumnya dengan ketebalan 150 mm dan didapatkan hasil bahwa DPT tidak aman karena tidak kuat menahan momen yang bekerja akibat gaya tekan air sehingga dilakukan perencanaan ulang DPT dengan ketebalan 200 mm beserta pelat lantainya Setelah dilakukan evaluasi terhadap fondasi bored pile dan merencanakan DPT dan pelat untuk GWT dilakukan juga perhitungan persentase beban GWT terhadap fondasi dibawahnya. Didapat hasil persentase beban GWT terhadap fondasi terbilang kecil karena hanya sebesar 8-10% dan fondasi masih dikatakan aman setelah menerima beban tambahan dari GWT.
Deskripsi Alternatif :Every building certainly requires a structure that can support the entire load of the building. The structure is the foundation that will transmit the load to the hard soil beneath it. In faculy of pharmacy UNJANI building, a bored pile foundation is used with a depth of 12 m. However, the results of the SPT test are known to be at a depth of 6 m including hard soil. So the authors evaluate by planning the bored pile foundation on point 9-B with a depth of 10 m and point 6-A and 5-A with a depth of 8 m. After calculating the bored pile foundation 6D900 for points 9-B and 6-A and 4D1000 for point 5-A. In the work of the underground structure of the faculy of pharmacy UNJANI building, there is also GWT (Ground Water Tank) which consist of retaining wall structures. As a result of this work, the foundation area under the GWT will receive a heavier load than the foundation area that is not affected by the GWT. Therefore, planning for retaining wall structures was also carried out by analyzing the previous DPT design with a thickness of 150 mm and the result was that DPT was not safe because it was not strong enough to withstand the working moments due to the compressive force of the water so that a re-planning of the DPT with a thickness of 200 mm was carried out along with the plate. floor After evaluating the bored pile foundation and planning the DPT and slab for GWT, the percentage of GWT load on the foundation below is also calculated. The results obtained that the percentage of GWT load on the foundation is relatively small because it is only 8-10% and the foundation is still said to be safe after receiving additional loads from GWT.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Dr. Syahril, BSCE., M.T.
Pembimbing 2: Dr. Ir. Riawan Gunadi, M.T., Editor: Muhammad Abdillah Islamy, S.Pd
Download...
File : KELENGKAPAN TA - 181111056 & 181111062.pdf
(1441594 bytes)
File : BAB 1 - 181111056 & 181111062.pdf
(601145 bytes)
File : BAB 2 - 181111056 & 181111062.pdf
(1753225 bytes)
File : BAB 5 - 181111056 & 181111062.pdf
(461447 bytes)