Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2019

Perancangan On-Line Uninterruptible Power Supply Untuk PLTP Kapasitas 35 MW

The Design of On-line Uninterruptible Power Supply for Geothermal Power Plant with Capacity 35 MW

Skripsi, 018 / 2019 / TPTL
Undergraduate Theses from JBPTPPOLBAN / 2021-09-06 13:56:03
Oleh : Panji Joyonegoro Ramadhan - 151724025 (panjijoy12@gmail.com)
Dibuat : 2020-01-10, dengan 0 file

Keyword : Beban-beban kritis, on-line UPS, mode operasi normal, mode operasi stored energi
Subjek : Critical loads, , on-line UPS, normal operation mode, stored energy mode
Sumber pengambilan dokumen : Penelitian dalam skripsi dalam proses pengajuan untuk diterbitkan pada Jurnal Nasional

Pada pembangkit listrik tenaga panas bumi, terdapat beban-beban kritis yang sangat sensitif terhadap gangguan dan tidak boleh kehilangan daya listrik secara tiba-tiba guna menunjang operasional pembangkit secara aman. Kondisi gangguan dan kehilangan daya bisa menyebabkan kerusakan pada sistem atau peralatan pembangkit jika tidak diatasi sebaik mungkin. Tugas akhir ini membahas perancangan sistem on-line uninterruptible power supply (UPS) dengan konfigurasi single UPS unit with separate battery charger yang dapat menjadi solusi dari permasalahan tersebut. Sistem UPS ini terdiri dari PWM inverter, penyearah tiga fasa gelombang penuh, battery charger, baterai, dan transformator. Komponen-komponen pada UPS tersebut terintegrasi satu dengan yang lainnya untuk menghasilkan tegangan output satu fasa 220 V, 50 Hz dari sumber tiga fasa 400 V. Terdapat dua mode operasi yang dirancang yaitu mode operasi normal dan stored energi. Mode operasi normal beroperasi untuk mengalirkan daya dari sumber ke beban dan ke baterai pada waktu yang bersamaan. Sementara itu mode operasi stored energi beroperasi ketika sumber utama mengalami gangguan sehingga baterai mengambil alih fungsi sebagai pemasok daya ke beban, untuk waktu selama 8 jam. Hasil perancangan menunjukkan bahwa UPS bekerja dengan baik sesuai spesifikasi yang ditetapkan. Untuk menunjang kemampuan bertahannya selama 8 jam, UPS membutuhkan baterai sebanyak 126 cell dengan kapasitas per cell 1210 Ah. Kata kunci: Beban-beban kritis, on-line UPS, mode operasi normal, mode operasi stored energi.

Deskripsi Alternatif :

On geothermal powerplant, there are very sensitive critical loads to fault and should not lose electric power suddenly for support safety operation of powerplant. Fault and power loss could damaging the system or several component in powerplant if there is no the solution to overcome these. This final project will discuss about design on on-line uninterruptible power supply (UPS) with single UPS unit with separate battery charger configuration which could be solution for this problem. This UPS system are consists of PWM inverter, three phase full wave rectifier, battery charger, battery, and transformer. These UPS components are integrated to produce 220 V and 50 Hz output from 400V three phase source. There are two operation mode that will be designed that are normal operation mode and energy stored. Normal operation mode operating to channel power from source to loads and to battery simultaneously. On the other hand energy stored operation mode operating when main source has fault so battery will taking over main source role for 8 hours duration. The design result will show that the UPS operate properly according to the provisions. For support the ability to last for 8 hours that needs 126 cell with 1210 Ah capacity per cell. Keywords: Critical loads, , on-line UPS, normal operation mode, stored energy mode.

Beri Komentar ?#(3) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Drs. Ali Mashar, M.Eng.Sc.

    Pembimbing 2: Dr. I Made Wiwit Kastawan, M.T., Editor: Erlin Arvelina