Path: Top > Skripsi - D4 > Jurusan Teknik Sipil > Prodi Teknik Perancangan Jalan & Jembatan > 2015 > REGULER
Perancangan Stuktur Atas Jembatan pada Sta. 1+810-1+840 Proyek Infrastruktur Vimala Hills Fase 2 dan 3 Ciawi Kabupaten Bogor
Design of Upper Bridge Structure Main Road Sta. 1+810-1+840 Project of Vimala Hills Infrastructure Phase 2 and 3 Ciawi Bogor Regency
Tugas Akhir, 003 / 2015 / TPJJUndergraduate Theses from JBPTPPOLBAN / 2018-09-03 15:06:05
Oleh : Peby Maulana - 091134024 (maulanapeby@gmail.com)
Dibuat : 2017-08-01, dengan 4 file
Keyword : Struktur Atas, Perhitungan, Metode Pelaksanaan, Rancangan Anggaran Biaya
Subjek : Upper Structure, Calculations, Construction Method, Draft Budgetary Plan
Perancangan struktur atas untuk jembatan jalan utama sta. 1+810-sta. 1+840 proyek infrastrukur Vimala Hills fase 2 dan 3 merupakan perancangan struktur atas dengan menggunakan balok prategang. Jembatan tersebut memiliki panjang bentang 30,434 m, panjang balok prategang 30 m, dengan tipe gelagar menggunakan PCI girder. Lebar perkerasan pada jembatan adalah 10 m dan jumlah balok sebanyak 5 buah. Perancangan struktur atas meliputi pembebanan jembatan, perencanaan beton bertulang, dan perencanaan beton prategang. Perhitungan untuk pembebanan dilakukan dengan cara perhitungan manual dan menggunakan software SAP 2000. Hasil pembebanan dibutuhkan untuk perhitungan beton bertulang dan beton prategang. Dari hasil perhitungan beton bertulang untuk pelat lantai, didapat tulangan D22-100 untuk tulangan utama tarik, D22-100 untuk tulangan utama tekan, dan D16-125 untuk tulangan bagi. Tulangan yang diperlukan untuk sandaran adalah D16-100 untuk tulangan utama dan D13-100 untuk tulangan bagi. Tulangan yang diperlukan untuk diafragma adalah 6 D19 untuk tulangan utama dan D13-200 untuk tulangan geser. Perhitungan balok prategang dilakukan dengan perhitungan beton prategang, dengan hasil perhitungannya adalah balok memakai kabel strand 12,7 mm sebanyak 11 buah / tendon dengan jumlah tendon 4 buah / balok, dan menggunakan tulangan non prategang D13. Metode pelaksanaan struktur atas menggunakan mobile crane dan alat launcher untuk memasang balok prategang, dan metode cast in situ untuk pelat lantai, trotoar, sandaran, dan diafragma. Pada rancangan anggaran biaya (RAB), struktur atas memerlukan biaya sebesar Rp 1.617.621.500,00 (satu milyar enam ratus tujuh belas juta enam ratus dua puluh satu ribu lima ratus rupiah). Kata kunci: Struktur Atas, Perhitungan, Metode Pelaksanaan, Rancangan Anggaran Biaya.
Deskripsi Alternatif :Design of upper bridge structure main road sta. 1+810-1+840, project of Vimala Hills infrastructure phase 2 and 3 is design of upper structure use prestressed girder. The bridge have long span 30,434 m, long prestressed girder 30 m, with girders type is PCI girder. Width pavement on the bridge is 10 m and total girders are 5 pieces. Design upper structure consist of loading bridge, design of reinforced concrete, and design of prestressed concrete. Calculation for loading bridge are done manually and using software SAP 2000. Loading results are needed for calculation of reinforced concrete and calculation of prestressed concrete. The result of reinforced concrete for slab obtained D22-100 for main tensile reinforcement, D22-125 for main compressive reinforcement, and D16-100 for distributed reinforcement. The parapet obtained D16-100 for main reinforcement and D13-100 for distributed reinforcement. The diaphragm obtained 6 D19 for main reinforcement and D13-200 for shear reinforcement. Calculation for prestressed girder using calculation of prestressed concrete, with the result of it is girders using strand cable 12,7 mm as many as 11 pieces / tendon, with the amount of tendon 4 pieces / girder, and using reinforcement D13. Construction method of upper structure using mobile crane and launcher for installing prestressed girders, and the cast in situ method used for slab, sidewalk, parapet, and diaphragm. At the draft budgetary plan, upper structure need budget as Rp 1.617.621.500,00 (One billion six hundred seventeen million six hundred twenty one five hundred thousand rupiah). Keywords: Upper Structure, Calculations, Construction Method, Draft Budgetary Plan.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing: Andri Budiadi, BSCE., M.Eng., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 091134024.pdf
(461499 bytes)
File : BAB 1 - 091134024.pdf
(289208 bytes)
File : BAB 2 - 091134024.pdf
(650437 bytes)
File : BAB 6 - 091134024.pdf
(186621 bytes)