Audit Energi Sistem Kelistrikan pada Gedung GKB POLBAN

Energy Auditing of Electricity System at GKB POLBAN Building

Tugas Akhir, 031 / 2013 / TEN
Undergraduate Theses from JBPTPPOLBAN / 2017-04-13 14:59:12
Oleh : Putu Dewi Fitriyani - 101711023 (dewi.fitri_putu@yahoo.co.id)
Dibuat : 2017-04-13, dengan 4 file

Keyword : Audit Energi, Profil Konsumsi Energi, Intensitas Konsumsi Energi, Kualitas Daya Listrik
Subjek : Energy Auditing, Energy Consumption Profile, Energy Consumption Intensity, Power Quality

Audit energi merupakan kegiatan yang dimaksudkan untuk mengidentifikasi dimana dan berapa energi digunakan serta langkah-langkah apa yang dapat dilakukan dalam rangka konservasi energi pada suatu fasilitas pengguna energi. Audit energi dilakukan pada sistem kelistrikan di Gedung Kuliah Baru (GKB) Politeknik Negeri Bandung (POLBAN). Profil konsumsi energi pada gedung GKB yakni utilitas pompa dan penerangan dan stop kontak. Konsumsi energi listrik pada utilitas pompa sebesar 3% sedangkan konsumsi energi listrik pada stop kontak dan penerangan sebesar 97%. Intensitas Konsumsi energi pada gedung GKB POLBAN sebesar 41.08 [kWh/m2/tahun]. Intensitas konsumsi energi tersebut diturunkan dengan metoda audit energi berupa retrofitting dan M&R (Maintenance and Repair). Retrofitting dilakukan dengan penggantian ballast konvensional menjadi ballast elektronik sehingga IKE menjadi 24.89 [kWh/m2/tahun] atau penurunan IKE sebesar 39.41%. Retrofitting dengan penggantian lampu TL menjadi lampu LED sehingga IKE menjadi 12.38 [kWh/m2/tahun] atau penurunan IKE sebesar 69.86%. M&R dilakukan dengan penyeimbangan beban ketiga phasa pada MDP sehingga IKE menjadi 13.68 [kWh/m2/tahun] atau penurunan IKE sebesar 33.3%. Kata Kunci: Audit Energi, Profil Konsumsi Energi, Intensitas Konsumsi Energi, Kualitas Daya Listrik.

Deskripsi Alternatif :

Energy auditing is an activity to identify where is and how much energy used and the steps that should do for energy conservation on energy user's facilities. Energy auditing was did on electricity system in GKB POLBAN building. Energy consumption's profile on GKB POLBAN building are pump utility, lighting and stop contact. Electricity energy consumption of pump is 3%, and electricity energy consumption of lighting and stop contacts are 97%. Energy consumption intensity on GKB POLBAN building is 41.08 [kWh/ m2/year]. Intensity of energy consumption can be decreased by energy auditing methods like retrofitting and M&R (Maintenance and Repair). Retrofitting was done by changed the conventional ballast with electronic ballast, so IKE became 24.89 [kWh/ m2/year] or IKE decreased 39.41%. Retrofitting by changed TL lamp with LED lamp, so IKE became 12.38 [kWh/ m2/year] or decreased 69.86%. M&R was done by load balancing all of three phase on MDP, so IKE became 13.68 [kWh/ m2/year] or IKE decreased 33.3%. Keywords: Energy Auditing, Energy Consumption Profile, Energy Consumption Intensity, Power Quality.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Ir. Kholiq Hernawan, M.T

    Pembimbing 2: Purwinda Iriani, S.Si., M.Si. , Editor: Erlin Arvelina

Download...