Path: Top > Skripsi - D4 > 2017 > Jurusan Teknik Konversi Energi > Program Studi Teknologi Pembangkit Tenaga Listrik > 2020
Perancangan PLTS Terpusat Off-Grid 13,2 kWp dengan Sistem DC-Coupling (Wilayah Studi: Desa Napisndi, Supiori, Papua)
Design of 13,2 kWp Off-Grid Centralized Solar Power Plant with DC-Coupling System (Study Area : Napisndi Village, Supiori, Papua)
Skripsi, 018 / 2020 / TPTLUndergraduate Theses from JBPTPPOLBAN / 2022-04-04 10:50:39
Oleh : Rachmat Iqbal - 161724021 (rachmat.iqbal6@gmail.com)
Dibuat : 2022-04-04, dengan 4 file
Keyword : Energi listrik, Photovoltaic, Pembangkit Listrik Tenaga Surya (PLTS) Off-Grid
Subjek : Electrical energy, Photovoltaic, Off-Grid Solar Power Plant
Rasio elektrifikasi Provinsi Papua pada tahun 2019 sebesar 90,47% namun nyatanya masih terdapat 13 Kabupaten yang memiliki rasio elektrifikasi yang masih relatif rendah. Kabupaten Supiori merupakan salah satu dari 13 Kabupaten yang memiliki rasio elektrifikasi rendah. Desa Napisndi merupakan salah satu desa di Kabupaten Supiori yang belum mendapatkan akses listrik dari PT. PLN (Persero), letak geografis desa yang berada di tepi laut menjadi salah satu kendala akses listrik dari jaringan PT. PLN (Persero) masuk ke desa, karena mahalnya biaya investasi pengembangan jaringan listrik. Solusi yang tepat untuk mengatasi ketiadaan energi listrik di Desa Napisndi adalah dengan memanfaatkan cahaya matahari yang melimpah yang dikonversikan menjadi energi listrik menggunakan teknologi photovoltaic. Berdasarkan hasil rancangan, PLTS Napisndi memiliki kapasitas 13,2 kWp yang terdiri dari 66 modul surya berkapasitas 200 Wp, 4 unit Solar Charge Controller (SCC) berkapasitas 4 kW, 1 unit Inverter 3,3 kW, dan 48 unit baterai berkapasitas 1000 Ah dengan tegangan 2Volt. Hasil simulasi yang dilakukan pada PVsyst dengan kebutuhan beban energi listrik DC sebesar 38,315 kWh/hari menunjukan perancangan PLTS Napisndi hanya mampu membangkitkan energi listrik sebesar 13,77 MWh/tahun dari total kebutuhan beban energil listrik sebesar 13,99 MWh/tahun. Jika dilihat dari nilai solar fraction (SF) PLTS Napisndi dapat membangkitkan energi untuk menyuplai kebutuhan beban sebesar 98,4% dalam setahun. PLTS Napisndi memiliki performance ratio sebesar 61%. Kata Kunci: Energi listrik, Photovoltaic, Pembangkit Listrik Tenaga Surya (PLTS) Off-Grid.
Deskripsi Alternatif :The electrification ratio of Papua Province in 2019 is 90.47% but in fact there are still 13 districts that have relatively low electrification ratios. Supiori Regency is one of 13 districts that have low electrification ratio. Napisndi Village is one of the villages in Supiori Regency that has not received electricity access from PT. PLN (Persero), the geographical location of villages on the coast is one of the obstacles to accessing electricity from the PT. PLN (Persero) entered the village, because high investment costs for developing the electricity network.The right solution to overcome the absence of electrical energy in Napisndi Village is to utilize abundant sunlight that is converted into electrical energy using photovoltaic technology. The results of the design, PLTS Napisndi has a capacity of 13,2 kWp consisting of 66 solar modules with a capacity of 200 Wp, 4 unit Solar Charge Controller (SCC) with a capacity of 4 kW, 1 unit inverter 3,3 kW, and 48 unit batteries with a capacity of 1000 Ah with a voltage of 2 volt. The simulation results on the PVSyst with DC energy load of 38.315 kWh/day that the design of PLTS Napisndi is only able to generate electrical energy of 13.77 MWh / year from the total need for electric energy load of 13.99 MWh/year. If seen from the value of solar fraction (SF), PLTS Napisndi can generate energy to supply load needs of 98.4% per year. PLTS Napisndi have performance ratio of 61%. Keywords: Electrical energy, Photovoltaic, Off-Grid Solar Power Plant.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Agoeng Harjatmo Rahardjo, M.T.
Pembimbing 2: Dr. Ir. Sapto Prajogo, M.Si., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN SKRIPSI - 161724021.pdf
(904227 bytes)
File : BAB 1 - 161724021.pdf
(233924 bytes)
File : BAB 2 - 161724021.pdf
(1290261 bytes)
File : BAB 6 - 161724021.pdf
(98943 bytes)