Path: Top > Tugas Akhir - D3 > 2017 > Jurusan Teknik Sipil > Program Studi Teknik Konstruksi Gedung > 2019

Evaluasi Daya Dukung Pondasi Bored Pile Terhadap Pengujian Pembebanan Statis Dan Dinamis Pada Proyek Cordova Edupartment, Semarang, Indonesia

Evaluation Of Bearing Capacity Of Bored Pile Foundation On Static And Dynamic Loading Test In Cordova Edupartment, Semarang, Indonesia

Tugas Akhir, 015 / 2019 / KGE
Undergraduate Theses from JBPTPPOLBAN / 2020-04-16 15:15:40
Oleh : Raden Raka Pandan Wangi - 161111054 & Rivaldo Wijaya - 161111058 (rwijaya59@gmail.com)
Dibuat : 2020-04-16, dengan 4 file

Keyword : bored pile, quality control, evaluasi, Axial Compression Static Loading Test, Pile Driving Analyzer
Subjek : bored pile, quality control, evaluation, Axial Compression Static Loading Test, Pile Driving Analyzer

Cordova Edupartment merupakan proyek apartemen pertama dari PT. Pilar Property dan PT. Penta Dinamika. Bangunan ini berfungsi sebagai hunian bertingkat yang memiliki 20 lantai yang terdiri dari 19 lantai Upper structure dan 1 lantai Sub Structure. Apartemen ini dibangun diatas lapisan tanah yang cukup dalam dan berlokasi di sekitar bangunan yaitu pemukiman dan bangunan bertingkat, oleh karena itu pemilihan jenis pondasi yang digunakan yaitu pondasi dalam bored pile. Pada pelaksanaan Sub Structure kontraktor mengajukan usulan perubahan desain kedalaman pondasi dari 30 meter menjadi 20 meter, hal ini terdapat batuan besar pada lapisan tanah kedalaman tertentu. Melihat pengurangan kedalam pondasi dan didukung dengan salah satu kekurangan pondasi bored pile yaitu sulitnya mengatur keseragaman mutu pondasi, maka perlu diadakan evaluasi sebagai langkah quality control untuk membuktikan desain usulan kontraktor efisien dan aman. Quality control desain ini didasari dengan membandingkan daya dukung ususlan desain pondasi dengan hasil pengujian pembebanan langsung. Tujuan dari quality control ini yaitu membuktikan keamanan pondasi, Desain dapat dikatakan aman apabila daya dukung tiang tunggal lebih kecil dari daya dukung hasil pengujian langsung dan daya dukung ijin grup tiang lebih besar dari beban yang bekerja. Dalam melakukan studi ini perlu diperhatikan faktor yang mempengaruhi hasil perbandingan, adapun faktor-faktor yang mempengaruhi adalah validitas data, analisis jenis lapisan tanah, metode perhitungan yang digunakan, jenis pengujian pembebanan langsung pondasi dan syarat-syarat yang berlaku. Analisis jenis lapisan tanah didasari dengan hasil investigasi tanah yang kami sajikan dalam bentuk statigrafi tanah, metode perhitungan daya dukung tiang tunggal yang digunakan adalah metode Meyerhof (1956) berdasarkan data pengujian Standard Penetration Test (SPT) dan jenis pengujian pembebanan yang dilakukan yaitu pemngujian pembebanan statis dan dinamis. Pembebanan statis didapatkan dari Axial Compression Static Loading dan Pembebanan dinamis didapatkan dari pengujian Pile Driving Analyzer (PDA). Syarat pengujian Axial Compression Static Loading Test berdasarkan ASTM D 1143-81 dan syarat pengujian Pile Driving Analyzer (PDA) yaitu ASTM D 4945-12. Studi ini meninjau 4 titik pondasi grup. Pada titik tersebut dilakukan pengujian pembebanan langsung. Studi ini menghasilkan daya dukung ijin tiang pada BH 1 = 3.155,75 kN, BH 2 = 3.301,02 kN dan BH 3 = 2.801,39. Daya dukung grup tiang P.3A (As B-2) = 7.204,84 kN, P.28 (As I3-K3) = 65.380,48 kN, P.3D (Q-7) = 6.461,19 kN, dan P.4D (As Q-6) = 9.014,52 kN. Beban ijin pengujian pada BH 1 = 3.400 kN, BH 2 = 3.500 kN, dan BH 3 = 3.500 kN. Studi membuktikan desain usulan pondasi aman terhadap beban yang bekerja dan beban aktual pengujian.

Deskripsi Alternatif :

Cordova Edupartment is the first apartment project from PT. Pilar Property and PT. Penta Dynamics. This building functions as a multi-storey dwelling that has 20 floors consisting of 19 floors of Upper structure and 1 floor of Sub-Structure. This apartment is built on a fairly deep layer of soil and is located around a building that is a habitation and a multi-storey building, therefore the selection of the type of foundation used is bored pile foundation. In the implementation of Sub-Structure, the contractor proposes a change in the design of the depth of the foundation from 30 meters to 20 meters, with large rocks at a certain depth. Seeing the reduction into the foundation and supported by one of the weaknesses of the bored pile foundation, which is the difficulty in regulating uniformity of foundation quality, it is necessary to conduct an evaluation as a quality control measure to prove the design of the proposed contractor is efficient and safe. Quality control of this design is based on comparing the bearing capacity of the foundation design and the results of direct loading testing. The purpose of this quality control is to prove the safety of the foundation, the design can be said to be safe if the bearing capacity of a single pile is smaller than the bearing capacity of the results of direct testing and the bearing capacity of the pile group permit is greater than the working load. In conducting this study, it is important to consider factors that influence the results of the comparison, while the factors that influence are data validity, analysis of soil type, calculation methods used, type of direct loading test of the foundation and applicable conditions. Analysis of soil layers type is based on the results of soil investigations that we present in the form of soil statigraphy, the method of calculating the carrying capacity of a single pIle used is the Meyerhof method (1956) based on Standard Penetration Test (SPT) testing data and the type of loading test performed, namely static loading testing and dynamic. Static loading is obtained from Axial Compression Static Loading and dynamic loading is obtained from Pile Driving Analyzer (PDA) testing. Axial Compression Static Loading Test test requirements based on ASTM D 1143-81 and Pile Driving Analyzer (PDA) testing requirements, namely ASTM D 4945-12. This study reviews the 4 foundation points of the group. At this point the direct loading test is performed. This study produces bearing capacity of a pole permit at BH 1 = 3,155.75 kN, BH 2 = 3,301.02 kN and BH 3 = 2,801.39. Bearing capacity of P.3A pole group (As B-2) = 7,204.84 kN, P.28 (As I3-K3) = 65,380.48 kN, P.3D (Q-7) = 6,461.19 kN, and P .4D (As Q-6) = 9,014.52 kN. The burden of the test permit at BH 1 = 3,400 kN, BH 2 = 3,500 kN, and BH 3 = 3,500 kN. The study proves the design of the proposed foundation is safe against the work load and the actual load testing.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTPPOLBAN
Organisasi
Nama KontakErlin Arvelina
AlamatJl. Trsn. Gegerkalong Hilir Ds. Ciwaruga
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 201 3789 ext. 168, 169, 239
Fax022 201 3889
E-mail Administratorerlin.arvelina@polban.ac.id
E-mail CKOerlin.arvelina@polban.ac.id

Print ...

Kontributor...

  • Pembimbing 1: Drs. Djuwadi, M.T.

    Pembimbing 2: Krish Madyono H., Dipl.Ing.H.T.L., M.T., Editor: Erlin Arvelina

Download...