Rancang Bangun Simulator Pmt Untuk Simulasi Gangguan Simpatetik Trip Pada Saluran Kabel Bawah Tanah
Design And Build Pmt Simulator For Protection Simulation Sympathetic Tripping Interruption In Underground Cable Channels
Tugas Akhir, 004 / 2015 / TLIUndergraduate Theses from JBPTPPOLBAN / 2018-07-17 15:00:05
Oleh : Ratu Utami Wirantika - 121321024 (ratuutami06@gmail.com)
Dibuat : 2018-07-17, dengan 4 file
Keyword : Penyulang, proteksi, inverse time relay, simpatetik trip, ground fault relay, gangguan hubung singkat 1 fasa ke tanah.
Subjek : Feeder, protection, inverse time relay, sympathetic trip, ground fault relay, one phase short circuit to ground.
Dalam setiap sistem tenaga listrik selalu digunakan sistem proteksi atau pengaman untuk mengurangi kerusakan peralatan-peralatan pada sistem tenaga listrik apabila terjadi gangguan. Sistem proteksi atau pengaman ini diperlukan untuk memisahkan bagian yang mengalami gangguan dengan yang tidak mengalami gangguan sehingga sistem dapat menjalankan operasinya. Apabila peralatan proteksi atau pengaman memberikan respon yang salah terhadap gangguan maka terjadi simpatetik trip. Simpatetik trip yaitu peristiwa yang menggambarkan kejadian ketika suatu peralatan proteksi atau pengaman merespon/menanggapi secara salah atau tidak diharapkan pada suatu kondisi atau keadaan sistem tenaga listrik yang sedang mengalami gangguan. Pada tugas akhir ini akan dibuat sebuah simulasi percobaan proteksi gangguan simpatetik trip yang disimulasikan dengan 2 buah penyulang di mana salah satu penyulang dilakukan gangguan hubung singkat 1 fasa ke tanah dan menggunakan ground fault relay karakteristik inverse time relay sebagai solusi agar tidak terjadinya gangguan simpatetik trip tersebut. Pembuatan simulasi ini diharapkan dapat memudahkan pada saat dilakukan praktikum percobaan gangguan simpatetik trip. Kata kunci: Penyulang, proteksi, inverse time relay, simpatetik trip, ground fault relay, gangguan hubung singkat 1 fasa ke tanah.
Deskripsi Alternatif :In any electric power system is always used protection system or safety to reduce damage to equipment-equipment of the power system in case of disruption. Protection or security system is necessary to separate the problematic parts that are not impaired so that the system can run its operations. If the protection or safety equipment provides an incorrect response to the disturbance occurred sympathetic trip. Sympathetic trip is events that describe the event as a protective or safety equipment to respond / do not respond incorrectly or may lead to a condition or state of a power system that is experiencing interference. In this final project will be made a simulation experiment sympathetic trip interruption protection is simulated with 2 feeders where one feeder done one phase short circuit to ground and use a ground fault relay inverse-time characteristics of the relay as a solution to avoid the disruption of the sympathetic trip. Making the simulation is expected to ease during the practicum conducted experiments sympathetic disorders trip. Keywords: Feeder, protection, inverse time relay, sympathetic trip, ground fault relay, one phase short circuit to ground.
Beri Komentar ?#(0) | Bookmark
Properti | Nilai Properti |
---|---|
ID Publisher | JBPTPPOLBAN |
Organisasi | |
Nama Kontak | Erlin Arvelina |
Alamat | Jl. Trsn. Gegerkalong Hilir Ds. Ciwaruga |
Kota | Bandung |
Daerah | Jawa Barat |
Negara | Indonesia |
Telepon | 022 201 3789 ext. 168, 169, 239 |
Fax | 022 201 3889 |
E-mail Administrator | erlin.arvelina@polban.ac.id |
E-mail CKO | erlin.arvelina@polban.ac.id |
Print ...
Kontributor...
- Pembimbing 1: Sunarto, S.T., M.Eng.
Pembimbing 2: Supriyanto, S.T., M.T., Editor: Erlin Arvelina
Download...
File : KELENGKAPAN TA - 121321024.pdf
(747663 bytes)
File : BAB 1 - 121321024.pdf
(212284 bytes)
File : BAB 2 - 121321024.pdf
(798997 bytes)
File : BAB 5 - 121321024.pdf
(239130 bytes)